Skip to main content

Another US$94.08mn for repairs to Hammersmith flyover in London

A further US$94.08 million (£60mn) is to be spent on fixing the Hammersmith flyover “monstrosity” in west London, England. Transport for London (TfL) is to fund a second phase of repairs to the structure’s badly corroded arches due to start in October 2013. The flyover was shut to all traffic just before Christmas 2011 to allow initial emergency arch repairs – leading to huge traffic chaos in west London – before being partially reopened a few weeks later. It was not fully opened until late May 2012.
June 14, 2013 Read time: 2 mins
A further US$94.08 million (£60mn) is to be spent on fixing the Hammersmith flyover “monstrosity” in west London, England.

2387 Transport for London (TfL) is to fund a second phase of repairs to the structure’s badly corroded arches due to start in October 2013. The flyover was shut to all traffic just before Christmas 2011 to allow initial emergency arch repairs – leading to huge traffic chaos in west London – before being partially reopened a few weeks later. It was not fully opened until late May 2012.

The latest work will take the total spent on maintaining it to at least $109.75 million (£70mn). The latest work will be carried out by the construction and civil engineering firm 2319 Costain.

Hammersmith flyover, which carries the A4 over Hammersmith and is used by 90,000 vehicles daily, will be subject to overnight lane closures, but engineers are confident there will be no need for weight restrictions.

Only last month, Hammersmith & Fulham Council (HFC) backed an expensive ‘flyunder’ tunnel as an alternative route into London from the west, but works could cost at least $392 million (£250mn) to complete.

Speaking recently on the long-running Hammersmith flyover safety saga, HFC council leader Nick Botterill reportedly said, “We know that vital repairs are necessary to the flyover but this needs to be the last time TfL spends a huge amount of taxpayers’ money on maintaining this monstrosity. Any other cash set aside for future work to the flyover needs instead to be pumped into making the flyunder a reality.

“A new tunnel solution would dramatically improve the quality of life for thousands of west Londoners and link the riverfront with Hammersmith town centre for the first time since the 60s.”

For more information on companies in this article

Related Content

  • TfL opts for RedSpeed safety cameras
    September 23, 2014
    RedSpeed International is to supply around 600 speed and red light safety cameras to Transport for London (TfL). The award is the result of a process which started in August 2012 and will see the company’s SpeedCurb and RedSpeed products progressively installed with a completion date of October 2016. The installation of the RedSpeed digital red light camera replacement in London has already started. The cameras not only enforce against red light running, but also monitor and enforce against vehicles brea
  • UK Government’s green light for new Taunton road link
    May 22, 2013
    Work on a new link road will go ahead in Taunton, western England after receiving final approval from Local Transport Minister Norman Baker. The work is needed to improve east-west connections across Taunton and open up access to new development. The overall US$32.07 million (£22.1mn) scheme will see Somerset County Council construct a new road linking Staplegrove Road in the west of the town to Priory Avenue in the east. “This important scheme will help to reduce traffic demand through the town centre and
  • UK’s A14 widening project ramps up with a recruitment drive
    November 11, 2016
    Contractors are gearing up for one of the UK’s largest road projects, the 34km widening of the A14 between the town of Huntingdon and city of Cambridge. The €1.7 billion government-funded scheme will be delivered over four years by a joint venture between Skanska, Costain, Balfour Beatty and Carillion.
  • Rotterdamsebaan infrastructure plans receive US$387.47mn
    June 27, 2013
    Dutch Infrastructure and Environment Minister Melanie Schultz van Haegen has promised to invest US$387.47 million (€295mn) in the new Rotterdamsebaan road between the Ypenburg junction and The Hague. The investment in the project, which has a total value of some $737.04 million (€565mn), is $91.31 million (€70mn) higher than Schultz van Haegen's predecessor promised in 2008. The council of The Hague and the urban region Haaglanden are pay for the rest of the project. The works, which includes a 2km long tu