Skip to main content

Another US$94.08mn for repairs to Hammersmith flyover in London

A further US$94.08 million (£60mn) is to be spent on fixing the Hammersmith flyover “monstrosity” in west London, England. Transport for London (TfL) is to fund a second phase of repairs to the structure’s badly corroded arches due to start in October 2013. The flyover was shut to all traffic just before Christmas 2011 to allow initial emergency arch repairs – leading to huge traffic chaos in west London – before being partially reopened a few weeks later. It was not fully opened until late May 2012.
June 14, 2013 Read time: 2 mins
A further US$94.08 million (£60mn) is to be spent on fixing the Hammersmith flyover “monstrosity” in west London, England.

2387 Transport for London (TfL) is to fund a second phase of repairs to the structure’s badly corroded arches due to start in October 2013. The flyover was shut to all traffic just before Christmas 2011 to allow initial emergency arch repairs – leading to huge traffic chaos in west London – before being partially reopened a few weeks later. It was not fully opened until late May 2012.

The latest work will take the total spent on maintaining it to at least $109.75 million (£70mn). The latest work will be carried out by the construction and civil engineering firm 2319 Costain.

Hammersmith flyover, which carries the A4 over Hammersmith and is used by 90,000 vehicles daily, will be subject to overnight lane closures, but engineers are confident there will be no need for weight restrictions.

Only last month, Hammersmith & Fulham Council (HFC) backed an expensive ‘flyunder’ tunnel as an alternative route into London from the west, but works could cost at least $392 million (£250mn) to complete.

Speaking recently on the long-running Hammersmith flyover safety saga, HFC council leader Nick Botterill reportedly said, “We know that vital repairs are necessary to the flyover but this needs to be the last time TfL spends a huge amount of taxpayers’ money on maintaining this monstrosity. Any other cash set aside for future work to the flyover needs instead to be pumped into making the flyunder a reality.

“A new tunnel solution would dramatically improve the quality of life for thousands of west Londoners and link the riverfront with Hammersmith town centre for the first time since the 60s.”

For more information on companies in this article

Related Content

  • ELE International's multi-channel GDU
    January 3, 2013
    ELE International is launching the Geotechnical Data Acquisition Unit (GDU), a multi-channel data logger which can co-ordinate test data from several different soil tests at the same time. This development means that a wide range of soil tests can be carried out in a very cost effective way, with accurate and reliable results, says ELE. Combining the GDU with the transducers from the various soil tests and ELE’s geotechnical software package DS7, creates a system which can co-ordinate and supervise the vari
  • Salerno Pompei Napoli wins A3 concession
    April 14, 2022
    The consortium Salerno Pompei Napoli will manage the A3 Autostrade for 25 years.
  • Solving Sao Paulo's traffic congestion problems
    July 10, 2012
    The Brazilian city of Sao Paulo suffers a heavily congested road network. Huge traffic jams up to 100km long are common and can be even 200km long in bad weather or at weekends and holidays. Of the 1.1 million vehicles that drive into Sao Paulo every day, almost a third are passing through and the new Rodoanel Mario Covas orbital route is intended to tackle the problem. This is a 170km long highway around the city that will connect the 10 highways linking Sao Paulo and allow many vehicles to avoid the conge
  • France is fixing flyovers and bridges
    October 1, 2018
    Bridge repairs are being prioritised in France following a series of inspections, triggered by the recent bridge collapse in Italy. There are 23 bridges that form part of France’s national road network that require attention. In all 164 key bridges in France need work, although most of this is comparatively minor and of these 122 are the responsibility of road operators with the remaining 42 the responsibility of the French Government. Two of the bridges however are in urgent need of repairs. Increased main