Skip to main content

Another US$94.08mn for repairs to Hammersmith flyover in London

A further US$94.08 million (£60mn) is to be spent on fixing the Hammersmith flyover “monstrosity” in west London, England. Transport for London (TfL) is to fund a second phase of repairs to the structure’s badly corroded arches due to start in October 2013. The flyover was shut to all traffic just before Christmas 2011 to allow initial emergency arch repairs – leading to huge traffic chaos in west London – before being partially reopened a few weeks later. It was not fully opened until late May 2012.
June 14, 2013 Read time: 2 mins
A further US$94.08 million (£60mn) is to be spent on fixing the Hammersmith flyover “monstrosity” in west London, England.

2387 Transport for London (TfL) is to fund a second phase of repairs to the structure’s badly corroded arches due to start in October 2013. The flyover was shut to all traffic just before Christmas 2011 to allow initial emergency arch repairs – leading to huge traffic chaos in west London – before being partially reopened a few weeks later. It was not fully opened until late May 2012.

The latest work will take the total spent on maintaining it to at least $109.75 million (£70mn). The latest work will be carried out by the construction and civil engineering firm 2319 Costain.

Hammersmith flyover, which carries the A4 over Hammersmith and is used by 90,000 vehicles daily, will be subject to overnight lane closures, but engineers are confident there will be no need for weight restrictions.

Only last month, Hammersmith & Fulham Council (HFC) backed an expensive ‘flyunder’ tunnel as an alternative route into London from the west, but works could cost at least $392 million (£250mn) to complete.

Speaking recently on the long-running Hammersmith flyover safety saga, HFC council leader Nick Botterill reportedly said, “We know that vital repairs are necessary to the flyover but this needs to be the last time TfL spends a huge amount of taxpayers’ money on maintaining this monstrosity. Any other cash set aside for future work to the flyover needs instead to be pumped into making the flyunder a reality.

“A new tunnel solution would dramatically improve the quality of life for thousands of west Londoners and link the riverfront with Hammersmith town centre for the first time since the 60s.”

For more information on companies in this article

Related Content

  • Bituchem's FortSeal makes 'speedy repairs'
    February 15, 2012
    UK company Bituchem hopes to capitalise on the growing need for road repairs with its proven FortSeal product. Developed in the US, it is said to offer an inexpensive method for repairing and sealing road surfaces. The fast-setting emulsion system can be used to cover small cracks and surface voids, as well as reducing surface brittleness and tackling ravelling.
  • Forget planes, trains and shipping: It’s roads that deliver the goods worldwide says Michelin at PPRS Paris 2015
    February 24, 2015
    Forget planes, trains and shipping if you want to be a successful global multi-national says Michelin: the only way to get the right things to the right places on time and on cost is by road. Speaking at the PPRS Paris 2015 pavement preservation and recycling summit, Michelin corporate affairs vice president Eric Le Corre said “we are a worldwide industrial giant that could not operate without good roads. Roads give the critical advantage in logistical terms. We can only be successful if the roads we use ar
  • Bentley Systems launches OpenRoads Designer CONNECT Edition
    April 13, 2017
    The beginning of this year saw Bentley Systems launch a major advanced comprehensive global tool for today’s increasingly widespread BIM environment. Christmas 2016 came early for Bentley's global clients. In fact, they had a hint of what was going to be under their tree come the celebrations in December. On November 1, at Bentley’s annual global client gathering and awards event Year in Infrastructure Conference in London, the solutions provider announced that OpenRoads Designer CONNECT Edition would be a
  • New truck parking facilities for major UK route
    May 26, 2016
    Contractor Balfour Beatty is to construct new truck parking facilities alongside the M20 motorway in Kent in the UK. The package of works was awarded by Highways England and the £130 million deal covers the development of the proposals during the Early Contractor Involvement (ECI) phase of the project. This deal also includes the construction of the lorry area subject to a decision to proceed from the UK Government. The £250 million truck parking area was initially announced by the UK’s Chancellor of the Ex