Skip to main content

Another US$94.08mn for repairs to Hammersmith flyover in London

A further US$94.08 million (£60mn) is to be spent on fixing the Hammersmith flyover “monstrosity” in west London, England. Transport for London (TfL) is to fund a second phase of repairs to the structure’s badly corroded arches due to start in October 2013. The flyover was shut to all traffic just before Christmas 2011 to allow initial emergency arch repairs – leading to huge traffic chaos in west London – before being partially reopened a few weeks later. It was not fully opened until late May 2012.
June 14, 2013 Read time: 2 mins
A further US$94.08 million (£60mn) is to be spent on fixing the Hammersmith flyover “monstrosity” in west London, England.

2387 Transport for London (TfL) is to fund a second phase of repairs to the structure’s badly corroded arches due to start in October 2013. The flyover was shut to all traffic just before Christmas 2011 to allow initial emergency arch repairs – leading to huge traffic chaos in west London – before being partially reopened a few weeks later. It was not fully opened until late May 2012.

The latest work will take the total spent on maintaining it to at least $109.75 million (£70mn). The latest work will be carried out by the construction and civil engineering firm 2319 Costain.

Hammersmith flyover, which carries the A4 over Hammersmith and is used by 90,000 vehicles daily, will be subject to overnight lane closures, but engineers are confident there will be no need for weight restrictions.

Only last month, Hammersmith & Fulham Council (HFC) backed an expensive ‘flyunder’ tunnel as an alternative route into London from the west, but works could cost at least $392 million (£250mn) to complete.

Speaking recently on the long-running Hammersmith flyover safety saga, HFC council leader Nick Botterill reportedly said, “We know that vital repairs are necessary to the flyover but this needs to be the last time TfL spends a huge amount of taxpayers’ money on maintaining this monstrosity. Any other cash set aside for future work to the flyover needs instead to be pumped into making the flyunder a reality.

“A new tunnel solution would dramatically improve the quality of life for thousands of west Londoners and link the riverfront with Hammersmith town centre for the first time since the 60s.”

For more information on companies in this article

Related Content

  • Sennebogen’s 830 Crawler and the sweet smell of success in Germany
    January 4, 2016
    Since 1942, the company Hermann Trollius has been processing limestone and dolomite in the Bavarian town of Lauterhofen and refining it for agricultural use, as well as in the building and industrial sectors. Trollius is now for the first time using residue from washing crushed dolomite, thanks to a Sennebogen material handler. The oft-discarded viscous mass is pumped out and then used as fertiliser. Manager Hermann Trollius - the third generation to run the family-owned company of 60 employees - says th
  • India's US$100 billion highway investment
    May 29, 2012
    India intends to continue its massive investment in highway spending. Predictions for the next five years say that up to US$100 billion will be spent on road building in the country in the coming five years. The Ministry for Road Transport and Highways plans to build 35,000km of highways, with 60% being provided by the Government budget and 40% from the private sector. The Ministry of Road, Transport and Highways will open up tendering for nine highway projects. The National Highway Authority of India (NHAI
  • Merseylink wins US$3.12bn Mersey Gateway Project contract
    June 20, 2013
    Merseylink was today announced as the preferred bidder for the US$3.12 billion (£2bn) Mersey Gateway Project in North West England. Making the announcement together in the observatory in the Catalyst Museum in Widnes overlooking the River Mersey, Halton Borough Council and Merseylink also confirmed they have jointly identified savings amounting to “tens of millions of pounds” on the projected public sector contribution to the project budget.
  • PTV Group retains London contract for modelling software
    October 1, 2019
    PTV Group said that it has been retained by Transport for London (TfL) as a supplier of tactical and operational modelling software.