Skip to main content

Another US$94.08mn for repairs to Hammersmith flyover in London

A further US$94.08 million (£60mn) is to be spent on fixing the Hammersmith flyover “monstrosity” in west London, England. Transport for London (TfL) is to fund a second phase of repairs to the structure’s badly corroded arches due to start in October 2013. The flyover was shut to all traffic just before Christmas 2011 to allow initial emergency arch repairs – leading to huge traffic chaos in west London – before being partially reopened a few weeks later. It was not fully opened until late May 2012.
June 14, 2013 Read time: 2 mins
A further US$94.08 million (£60mn) is to be spent on fixing the Hammersmith flyover “monstrosity” in west London, England.

2387 Transport for London (TfL) is to fund a second phase of repairs to the structure’s badly corroded arches due to start in October 2013. The flyover was shut to all traffic just before Christmas 2011 to allow initial emergency arch repairs – leading to huge traffic chaos in west London – before being partially reopened a few weeks later. It was not fully opened until late May 2012.

The latest work will take the total spent on maintaining it to at least $109.75 million (£70mn). The latest work will be carried out by the construction and civil engineering firm 2319 Costain.

Hammersmith flyover, which carries the A4 over Hammersmith and is used by 90,000 vehicles daily, will be subject to overnight lane closures, but engineers are confident there will be no need for weight restrictions.

Only last month, Hammersmith & Fulham Council (HFC) backed an expensive ‘flyunder’ tunnel as an alternative route into London from the west, but works could cost at least $392 million (£250mn) to complete.

Speaking recently on the long-running Hammersmith flyover safety saga, HFC council leader Nick Botterill reportedly said, “We know that vital repairs are necessary to the flyover but this needs to be the last time TfL spends a huge amount of taxpayers’ money on maintaining this monstrosity. Any other cash set aside for future work to the flyover needs instead to be pumped into making the flyunder a reality.

“A new tunnel solution would dramatically improve the quality of life for thousands of west Londoners and link the riverfront with Hammersmith town centre for the first time since the 60s.”

For more information on companies in this article

Related Content

  • Highways England tests ghostbusters
    March 9, 2021
    Highways England is testing seven new road marking products as part of a major international project to rid road surfaces of confusing ghost markings
  • Oslofjord Tunnel closed for repairs for up to three weeks
    May 12, 2017
    The 7km subsea Oslofjord Tunnel in Norway will be closed for up to three weeks after a truck caught fire in the tunnel on May 5. Norwegian media report that a 500m stretch was damaged - tunnel vault, cables, insulation and road surface. The tunnel is equipped with 25 evacuation rooms that can be sealed off from the main tunnel. Each room can provide pressurised space for up to 50 people while a fire is being fought. However, the latest incident has spurred the government to announce that a second tube will
  • America faces another major highway funding crisis says TCC
    October 3, 2014
    The United State is facing yet another national highway funding crisis as the country’s new fiscal year begins. Despite the fact that October 1 marked the beginning of America’s new financial year, Congress has still not passed or approved the funding for a new long-term surface transportation measure. This is really worrying the 31-member-strong Transportation Construction Coalition (TCC) which is arguing that a “failure to act” will “lead to another self-imposed funding crisis that would undermine vital r
  • London to trial wireless charging
    April 30, 2012
    Qualcomm has announced the first wireless electric vehicle charging (WEVC) trial for London in collaboration with the UK Government, as well as the Mayor of London's office and Transport for London (TfL). The pre-commercial trial is expected to start in early 2012 and will involve as many as 50 electric vehicles (EVs) using Qualcomm wireless inductive power transfer technology that enables high-efficiency power transfer across a large air gap. The driver simply parks the vehicle in the usual way and the sys