Skip to main content

Alpha 330 drilling tool system from Sandvik

Sandvik Construction is launching its new Alpha 330 drilling tool system for drilling and tunnelling. It has been developed with special features that control power and ensure this power is transmitted into the rock as efficiently, accurately and economically as possible. The company says that in tests, in varying rock conditions, the new design has been proven to deliver a 30-80% increase in rod life; provide more accurate collaring and straighter blast-holes, thereby delivering greater advancement and imp
January 6, 2017 Read time: 2 mins
Sandvik Construction is offering its new Alpha 330 drilling tool system
2403 Sandvik Construction is launching its new Alpha 330 drilling tool system for drilling and tunnelling.

It has been developed with special features that control power and ensure this power is transmitted into the rock as efficiently, accurately and economically as possible.

The company says that in tests, in varying rock conditions, the new design has been proven to deliver a 30-80% increase in rod life; provide more accurate collaring and straighter blast-holes, thereby delivering greater advancement and improved profile control. This enables projects to be completed more rapidly, as well as reducing the overall cost of drilling and tunnelling, says Sandvik.

The Sandvik Alpha 330 has been designed and dimensionally optimised to replace the R32 connections, which until now has been the dominant Ø 45mm system.

“A key development of this advanced new system sees the drill string rod/bit connection featuring an entirely new thread design. Furthermore the Alpha 330 possesses a shorter thread on the hexagonal rods in the tool system resulting in a rigid, integrated power-pack drill string, which possesses superior resistance to bending stresses, thereby securing perfect energy transfer,” says Sandvik.

“As part of the manufacturing process more steel has been used for higher fatigue strength, which further helps ensure exact collaring and straighter holes, as well as delivering a 30-80% increase in rod life.”

Customer feedback on the Sandvik Alpha 330 tool system in global tunnelling projects is said to have shown rod life has been extended by at least 30% and longer shank adaptor and coupling lifespans.

Stand: F6.616/1

%$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal www.Construction.Sandvik.com www.Construction.Sandvik.com false http://www.construction.sandvik.com/ false false%>

%$Linker: 2 Internal <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 11560 0 oLinkInternal <span class="oLinkInternal"><span class="oLinkInternal">View more videos</span></span> Video false /event-news/bauma-2013/video/ true false%>

For more information on companies in this article

Related Content

  • Liebherr 150EC-B is latest flat-top crane
    February 7, 2013
    Liebherr will show a modular design flat-top tower crane in the 150EC-B at this year’s Bauma. The 150EC-B is available in FR.tronic, with traditional contractor controls, or Litronic version with programmable logic controls. The flat-top crane can be had in 6 tonne and 8 tonne versions, with a maximum hook height of 63m and maximum working radius of 60m. Lift capacity at full radius is 1,700kg.
  • Doka showcases Cut&Cover tunnel construction solution
    January 6, 2017
    Austrian firm Doka will be showcasing at bauma its first system to be specifically designed and optimised for cut-and-cover tunnel construction. With Doka CC (Cut and Cover), different types of traffic tunnel, such as rail or road tunnels, are said to be able to be built quickly, efficiently and safely. Doka says the creation of its innovative tunnel system was made possible only by the use of hi-tech construction materials and products such as the Composite formwork beam I tec 20. The choice of high-grade
  • Doka showcases Cut&Cover tunnel construction solution
    February 7, 2013
    Austrian firm Doka will be showcasing at bauma its first system to be specifically designed and optimised for cut-and-cover tunnel construction. With Doka CC (Cut and Cover), different types of traffic tunnel, such as rail or road tunnels, are said to be able to be built quickly, efficiently and safely. Doka says the creation of its innovative tunnel system was made possible only by the use of hi-tech construction materials and products such as the Composite formwork beam I tec 20. The choice of high-grade
  • Tecnoidea Impianti plants reputation worldwide
    April 9, 2013
    With over 3,600,000m³ of water purified daily in more than 3,000 of its plants all over the world, Tecnoidea Impianti is one of the leading companies worldwide for water purification plants and sludge treatment systems. Its closed-cycle plants are aimed at marble and granites, aggregates and soil washing, tunnelling and concrete areas.