Skip to main content

ALLU’s new GPS system for mass stabilisation

Mass stabilisation is a method for strengthening soft soils, and it can also be used for processing contaminated material by encapsulating the soil in situ and thus preventing the contaminant from spreading into the surrounding areas. According to Finnish company ALLU, which is introducing its new ALLU 3D Positioning System, the most popular use of mass stabilisation technology currently is in road construction projects and harbours, although more recently many clients globally are exploring the technique f
January 6, 2017 Read time: 2 mins
ALLU's new ALLU 3D Positioning System
Mass stabilisation is a method for strengthening soft soils, and it can also be used for processing contaminated material by encapsulating the soil in situ and thus preventing the contaminant from spreading into the surrounding areas.

According to Finnish company 2180 ALLU, which is introducing its new ALLU 3D Positioning System, the most popular use of mass stabilisation technology currently is in road construction projects and harbours, although more recently many clients globally are exploring the technique for processing difficult- to-handle sludges as an alternative to more expensive methods currently being used such as mass change.

The mass stabilisation process is carried out by feeding dry powder such as binder from a pressure feeder via hose to the mixing head mounted on an excavator.

With the ALLU 3D Positioning System, which consists of four modules  (computer unit with software, touch screen, base station and GPS sensor utilising GPS –signals)  the mixing head is positioned to the right place on the work area.

The system guides the base machine operator to feed right amount of binder and to mix adequately each block of the site. It also tells when to change location and start stabilising from another point.

“Thus it eases the performance of the mixing work, ensures homogenous mixing results and accurate binder feeding as well as reduces the consumption of the binder,” says ALLU.

The new ALLU 3D Positioning System can be mounted on old and new ALLU  stabilisation  systems.

%$Linker: 2 Asset <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 48325 0 oLinkExternal www.allu.net www.allu.net false /EasySiteWeb/GatewayLink.aspx?alId=48325 false false%>

For more information on companies in this article

Related Content

  • Sophisticated weighing for loaders
    January 6, 2017
    Sophisticated on-board weighing systems for use with wheeled loaders and excavators are being offered by Loup Electronics. The innovative LOADEX 100 is a retrofittable scale installed on tracked and wheeled excavators and material handlers to weigh the amount of material load in the bucket or grab. Pressure signals are captured, filtered and corrected by measuring the angle of the main boom using either an RDS Inclinometer or Mechanical Angle sensor. When used dynamically, the pressures are captured through
  • BOMAG expands its soil stabiliser offering
    January 6, 2017
    BOMAG is expanding its soil stabiliser range with the launch of the MPH600 for its line-up. Replacing the earlier MPH125, this top-of-the-line model is designed to offer increased performance and productivity, along with accurate mixing capabilities. The machine is equipped with the firm’s novel FLEXMIX system that is said to optimise mixing performance, while the machine also features a new 447kW emission compliant engine that is said to be highly fuel efficient. The sophisticated FLEXMIX system features a
  • BOMAG expands its soil stabiliser offering
    February 11, 2013
    BOMAG is expanding its soil stabiliser range with the launch of the MPH600 for its line-up. Replacing the earlier MPH125, this top-of-the-line model is designed to offer increased performance and productivity, along with accurate mixing capabilities. The machine is equipped with the firm’s novel FLEXMIX system that is said to optimise mixing performance, while the machine also features a new 447kW emission compliant engine that is said to be highly fuel efficient. The sophisticated FLEXMIX system features a
  • Fast, cost-effective road stabilisation
    February 15, 2012
    The Kivikko industrial area in Finland, which is owned by the City of Helsinki, has expanded gradually over the years and it has expanded again with the new stabilised area now about 3.5hectares. The ALLU equipment and system was used to stabilise Kivikko for the first time in 2001, and the latest job started in June 2010 with the stabilisation work completed by mid-December 2010. [The ALLU Stabilisation System is a Finnish invention that provides a fast, cost-effective and environmental-friendly working