Skip to main content

Algeria gives go ahead for 63km Guelma-Annaba motorway

Work has started on Algeria’s 63km bypass motorway to connect Guelma with Annaba and the East-West motorway, which is set to be completed within two years. Algeria’s Minister for Public Works Abdelkader Kadi made the announcement, has announced the launch of work on the 63km bypass connecting Guelma with Annaba. Nearly $346 million has been set aside for the 35km part of the project within the province of Guelma. In the province of Annaba, Kadi said that work had started on another section of the mot
December 11, 2014 Read time: 2 mins
Work has started on Algeria’s 63km bypass motorway to connect Guelma with Annaba and the East-West motorway, which is set to be completed within two years.

Algeria’s Minister for Public Works Abdelkader Kadi made the announcement, has announced the launch of work on the 63km bypass connecting Guelma with Annaba. Nearly $346 million has been set aside for the 35km part of the project within the province of Guelma.

In the province of Annaba, Kadi said that work had started on another section of the motorway near the Rabah-Bitat airport. He also announced the opening of the 1.2km Annaba viaduct which cost $254 million.

3260 World Highways %$Linker: 2 Internal <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 19290 0 oLinkExternal reported in November Visit &quot;algerian highway deals being planned&quot; page false /categories/auctions-equipment-supply-servicing-finance/news/algerian-highway-deals-being-planned/ false false%> that the package for the 84km section connecting Annaba with the Tunisian border via the El-Tarf province was allocated to two national groupings. The work was previously being done by the Japanese firm Cojaal.

The Ministry for Public Works said in November that tolling on the East-West Highway will start before the end of 2015. A study is underway to determine how charges can be based on the maintenance and management costs of the link.

For more information on companies in this article

Related Content

  • Dynapac introduces new compaction equipment
    February 13, 2013
    Focussing on advanced compaction and paving equipment, Atlas Copco Road Construction Equipment Division highlights a number of new products “We have been working hard and determent, listening carefully to our customer’s needs and present a great range of new and updated products.” says Herman Matthyssen, vice president marketing west. “Up-time, ergonomics, reliability and serviceability are key success factors nowadays."
  • New Holland Construction showcases new low profile cab on F Series graders
    January 6, 2017
    New Holland Construction (NHC) is unveiling at bauma the new low profile cab and FleetForce telematics system in its F Series graders which, the Italian company claims, are the best-selling graders in Europe. The new cab reduces the grader’s maximum height by 180mm, taking it down to just 3.06m. This is said to remove all transport limitations for both F106.7 and F156.7 models, whether they are fitted with 50.8cm or 63.5cm tyres.
  • New Holland Construction showcases new low profile cab on F Series graders
    February 11, 2013
    New Holland Construction (NHC) is unveiling at bauma the new low profile cab and FleetForce telematics system in its F Series graders which, the Italian company claims, are the best-selling graders in Europe. The new cab reduces the grader’s maximum height by 180mm, taking it down to just 3.06m. This is said to remove all transport limitations for both F106.7 and F156.7 models, whether they are fitted with 50.8cm or 63.5cm tyres.
  • Bordeaux gets sixth bridge, Simone Veil Bridge, formerly JJ Bosc
    July 11, 2017
    The French city of Bordeaux has awarded Razel-Bec a contract for construction of a new bridge across the Garonne River. The city of Bordeaux awarded Razel-Bec one of the largest urban development project in France, construction of the Simone Veil Bridge. The 550m bridge over the River Garonne will be 45m wide and lie between Bordeaux and the city of Floriac. Construction will start in September and take around 32 months. Cost will be nearly €83.9 million.