Skip to main content

Algeria gives go ahead for 63km Guelma-Annaba motorway

Work has started on Algeria’s 63km bypass motorway to connect Guelma with Annaba and the East-West motorway, which is set to be completed within two years. Algeria’s Minister for Public Works Abdelkader Kadi made the announcement, has announced the launch of work on the 63km bypass connecting Guelma with Annaba. Nearly $346 million has been set aside for the 35km part of the project within the province of Guelma. In the province of Annaba, Kadi said that work had started on another section of the mot
December 11, 2014 Read time: 2 mins
Work has started on Algeria’s 63km bypass motorway to connect Guelma with Annaba and the East-West motorway, which is set to be completed within two years.

Algeria’s Minister for Public Works Abdelkader Kadi made the announcement, has announced the launch of work on the 63km bypass connecting Guelma with Annaba. Nearly $346 million has been set aside for the 35km part of the project within the province of Guelma.

In the province of Annaba, Kadi said that work had started on another section of the motorway near the Rabah-Bitat airport. He also announced the opening of the 1.2km Annaba viaduct which cost $254 million.

3260 World Highways %$Linker: 2 Internal <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 19290 0 oLinkExternal reported in November Visit &quot;algerian highway deals being planned&quot; page false /categories/auctions-equipment-supply-servicing-finance/news/algerian-highway-deals-being-planned/ false false%> that the package for the 84km section connecting Annaba with the Tunisian border via the El-Tarf province was allocated to two national groupings. The work was previously being done by the Japanese firm Cojaal.

The Ministry for Public Works said in November that tolling on the East-West Highway will start before the end of 2015. A study is underway to determine how charges can be based on the maintenance and management costs of the link.

For more information on companies in this article

Related Content

  • Trimble and Manitowoc deal boost to construction world
    January 6, 2017
    Trimble and Manitowoc Cranes are collaborating on developing technology that boosts construction lifting industry productivity, while improving onsite crane use and data management.
  • Trimble and Manitowoc deal boost to construction world
    February 1, 2012
    Trimble and Manitowoc Cranes are collaborating on developing technology that boosts construction lifting industry productivity, while improving onsite crane use and data management.
  • New Holland shows new E385C and E485C excavators at INTERMAT 2012
    January 6, 2017
    New Holland is introducing new models of heavy-duty crawler excavators. The E385C and E485C are in the 35tonne and 48tonne category respectively. The Holland said that they have been built deal with the most demanding applications and harshest conditions. The latest models offer more power and fast cycles with new Tier 4 interim engines and new hydraulics. Fuel consumption is improved through the new hydraulics and new ECO working mode.
  • New Holland shows new E385C and E485C excavators at INTERMAT 2012
    April 4, 2012
    New Holland is introducing new models of heavy-duty crawler excavators. The E385C and E485C are in the 35tonne and 48tonne category respectively. The Holland said that they have been built deal with the most demanding applications and harshest conditions. The latest models offer more power and fast cycles with new Tier 4 interim engines and new hydraulics. Fuel consumption is improved through the new hydraulics and new ECO working mode.