Skip to main content

Algeria gives go ahead for 63km Guelma-Annaba motorway

Work has started on Algeria’s 63km bypass motorway to connect Guelma with Annaba and the East-West motorway, which is set to be completed within two years. Algeria’s Minister for Public Works Abdelkader Kadi made the announcement, has announced the launch of work on the 63km bypass connecting Guelma with Annaba. Nearly $346 million has been set aside for the 35km part of the project within the province of Guelma. In the province of Annaba, Kadi said that work had started on another section of the mot
December 11, 2014 Read time: 2 mins
Work has started on Algeria’s 63km bypass motorway to connect Guelma with Annaba and the East-West motorway, which is set to be completed within two years.

Algeria’s Minister for Public Works Abdelkader Kadi made the announcement, has announced the launch of work on the 63km bypass connecting Guelma with Annaba. Nearly $346 million has been set aside for the 35km part of the project within the province of Guelma.

In the province of Annaba, Kadi said that work had started on another section of the motorway near the Rabah-Bitat airport. He also announced the opening of the 1.2km Annaba viaduct which cost $254 million.

3260 World Highways %$Linker: 2 Internal <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 19290 0 oLinkExternal reported in November Visit &quot;algerian highway deals being planned&quot; page false /categories/auctions-equipment-supply-servicing-finance/news/algerian-highway-deals-being-planned/ false false%> that the package for the 84km section connecting Annaba with the Tunisian border via the El-Tarf province was allocated to two national groupings. The work was previously being done by the Japanese firm Cojaal.

The Ministry for Public Works said in November that tolling on the East-West Highway will start before the end of 2015. A study is underway to determine how charges can be based on the maintenance and management costs of the link.

For more information on companies in this article

Related Content

  • Haulotte adds to rough terrain boom range
    April 18, 2013
    Haulotte has added the HT21RT and HT23RTJ to its self-propelled boom line-up. The HT21RT has a working height of 20.6m, up to 15.9m of outreach. It is available in both two-and four-wheel drive versions.
  • New quenched and tempered steels from NLMK Clabecq
    January 6, 2017
    NLMK Clabecq is launching new quenched and tempered steel products in 2013, with wider ranges of thicknesses and grades. During 2013, the Belgian specialist in thin and large steel plates intends to introduce superior grades for Quard, its abrasion resistant steel and Quend, its high yield strength steel. These introductions will to the range of solutions for heavy machinery manufacturers. Marketing manager Bernard Robins said, “Tests we are conducting with manufacturers are very positive. Welding our steel
  • New quenched and tempered steels from NLMK Clabecq
    February 5, 2013
    NLMK Clabecq is launching new quenched and tempered steel products in 2013, with wider ranges of thicknesses and grades. During 2013, the Belgian specialist in thin and large steel plates intends to introduce superior grades for Quard, its abrasion resistant steel and Quend, its high yield strength steel. These introductions will to the range of solutions for heavy machinery manufacturers. Marketing manager Bernard Robins said, “Tests we are conducting with manufacturers are very positive. Welding our steel
  • Hydrokit shows dust suppressor for dumptrucks at INTERMAT 2012
    January 6, 2017
    On-board dust suppression for dumptrucks has been introduced by Hydrokit. Water spraying takes place in front of the truck as it drives in dusty situations such as quarries.