Skip to main content

Algeria gives go ahead for 63km Guelma-Annaba motorway

Work has started on Algeria’s 63km bypass motorway to connect Guelma with Annaba and the East-West motorway, which is set to be completed within two years. Algeria’s Minister for Public Works Abdelkader Kadi made the announcement, has announced the launch of work on the 63km bypass connecting Guelma with Annaba. Nearly $346 million has been set aside for the 35km part of the project within the province of Guelma. In the province of Annaba, Kadi said that work had started on another section of the mot
December 11, 2014 Read time: 2 mins
Work has started on Algeria’s 63km bypass motorway to connect Guelma with Annaba and the East-West motorway, which is set to be completed within two years.

Algeria’s Minister for Public Works Abdelkader Kadi made the announcement, has announced the launch of work on the 63km bypass connecting Guelma with Annaba. Nearly $346 million has been set aside for the 35km part of the project within the province of Guelma.

In the province of Annaba, Kadi said that work had started on another section of the motorway near the Rabah-Bitat airport. He also announced the opening of the 1.2km Annaba viaduct which cost $254 million.

3260 World Highways %$Linker: 2 Internal <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 19290 0 oLinkExternal reported in November Visit &quot;algerian highway deals being planned&quot; page false /categories/auctions-equipment-supply-servicing-finance/news/algerian-highway-deals-being-planned/ false false%> that the package for the 84km section connecting Annaba with the Tunisian border via the El-Tarf province was allocated to two national groupings. The work was previously being done by the Japanese firm Cojaal.

The Ministry for Public Works said in November that tolling on the East-West Highway will start before the end of 2015. A study is underway to determine how charges can be based on the maintenance and management costs of the link.

For more information on companies in this article

Related Content

  • BLS Enterprises is offering new milling machine trackpads
    January 6, 2017
    Component specialist BLS Enterprises is offering a durable replacement track pad for use on Wirtgen milling machines. President Barry Stoughton said, “We have a direct replacement for the EPS system.” He said that this two part pad system allows the pad to bolt directly onto the track. Long life and durability are claimed, as well as ease of replacement.
  • BLS Enterprises is offering new milling machine trackpads
    April 11, 2013
    Component specialist BLS Enterprises is offering a durable replacement track pad for use on Wirtgen milling machines. President Barry Stoughton said, “We have a direct replacement for the EPS system.” He said that this two part pad system allows the pad to bolt directly onto the track. Long life and durability are claimed, as well as ease of replacement.
  • Haver & Boecker is adding to its screen range with wire and polyurethane screen decks
    February 8, 2013
    Haver & Boecker is expanding its screen range with the addition of the Ty-Wire hybrid screen deck and of ultrasound screen decks. Ty-Wire hybrid screens use wire that is covered in polyurethane, providing a greater open area than a standard PU screen but with a lifetime that can be 4-6 times longer.
  • LiuGong 900E excavators “very key” for company future
    January 6, 2017
    A senior LiuGong figure says the company’s keenly awaited 900E Series excavator is a “very key machine” for its future. Dave Beatenbough, vice president of the Chinese construction equipment manufacturing giant’s research and development arm, said production of the model at LiuGong’s Dressta base in Poland was expected to begin “within three months”.