Skip to main content

Algeria gives go ahead for 63km Guelma-Annaba motorway

Work has started on Algeria’s 63km bypass motorway to connect Guelma with Annaba and the East-West motorway, which is set to be completed within two years. Algeria’s Minister for Public Works Abdelkader Kadi made the announcement, has announced the launch of work on the 63km bypass connecting Guelma with Annaba. Nearly $346 million has been set aside for the 35km part of the project within the province of Guelma. In the province of Annaba, Kadi said that work had started on another section of the mot
December 11, 2014 Read time: 2 mins
Work has started on Algeria’s 63km bypass motorway to connect Guelma with Annaba and the East-West motorway, which is set to be completed within two years.

Algeria’s Minister for Public Works Abdelkader Kadi made the announcement, has announced the launch of work on the 63km bypass connecting Guelma with Annaba. Nearly $346 million has been set aside for the 35km part of the project within the province of Guelma.

In the province of Annaba, Kadi said that work had started on another section of the motorway near the Rabah-Bitat airport. He also announced the opening of the 1.2km Annaba viaduct which cost $254 million.

3260 World Highways %$Linker: 2 Internal <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 19290 0 oLinkExternal reported in November Visit &quot;algerian highway deals being planned&quot; page false /categories/auctions-equipment-supply-servicing-finance/news/algerian-highway-deals-being-planned/ false false%> that the package for the 84km section connecting Annaba with the Tunisian border via the El-Tarf province was allocated to two national groupings. The work was previously being done by the Japanese firm Cojaal.

The Ministry for Public Works said in November that tolling on the East-West Highway will start before the end of 2015. A study is underway to determine how charges can be based on the maintenance and management costs of the link.

For more information on companies in this article

Related Content

  • VF VENIERI for eco-friendly construction manufacturing
    April 9, 2013
    VF VENIERI manufactures top quality wheeled loaders and articulated and compact backhoe loaders. Based in Lugo, near Bologna, since 1948, the firm also offers a wide range of used construction machines. Covering more than 90,000m², VF VENIERI’S five buildings on its factory site are completely self-powered by renewable energy. A worldwide reputation for reliability, performance and superior customer care, are other key qualities of the VF VENIERI brand.
  • Amsterdam’s Superbelangrijk campaign aimed at cyclists who text
    February 1, 2018
    An increasing number of accidents has forced Amsterdam city to launch a safety campaign aimed at stopping mostly young cyclists from texting while riding. With a view to incoming legislation, the city of Amsterdam in cooperation with GVB (Amsterdam City Transportation) and Vervoerregio Amsterdam (Amsterdam Regional Transport) started the Superbelangrijk campaign. Literally translated as Super-important, the campaign is to educate cyclists, as well as pedestrians, of the dangers of taking your eyes off the
  • Bridge building in miniature by Cimolai
    January 6, 2017
    Bespoke equipment supplier Cimolai Technology is exhibiting a model of the equipment it supplied for a Bulgarian bridge project. Construction of the bridge entailed lifting and positioning pre-cast sections weighing up to 260tonnes. Cimolai designed, built and supplied a bespoke cantilever lifting system to sit atop the centre pillar and simultaneously hoist the blocks from barges 42m below on the river Danube. The company said its European contracting customers are increasingly winning orders further afiel
  • Bridge building in miniature by Cimolai
    April 19, 2013
    Bespoke equipment supplier Cimolai Technology is exhibiting a model of the equipment it supplied for a Bulgarian bridge project. Construction of the bridge entailed lifting and positioning pre-cast sections weighing up to 260tonnes. Cimolai designed, built and supplied a bespoke cantilever lifting system to sit atop the centre pillar and simultaneously hoist the blocks from barges 42m below on the river Danube. The company said its European contracting customers are increasingly winning orders further afiel