Skip to main content

Algeria gives go ahead for 63km Guelma-Annaba motorway

Work has started on Algeria’s 63km bypass motorway to connect Guelma with Annaba and the East-West motorway, which is set to be completed within two years. Algeria’s Minister for Public Works Abdelkader Kadi made the announcement, has announced the launch of work on the 63km bypass connecting Guelma with Annaba. Nearly $346 million has been set aside for the 35km part of the project within the province of Guelma. In the province of Annaba, Kadi said that work had started on another section of the mot
December 11, 2014 Read time: 2 mins
Work has started on Algeria’s 63km bypass motorway to connect Guelma with Annaba and the East-West motorway, which is set to be completed within two years.

Algeria’s Minister for Public Works Abdelkader Kadi made the announcement, has announced the launch of work on the 63km bypass connecting Guelma with Annaba. Nearly $346 million has been set aside for the 35km part of the project within the province of Guelma.

In the province of Annaba, Kadi said that work had started on another section of the motorway near the Rabah-Bitat airport. He also announced the opening of the 1.2km Annaba viaduct which cost $254 million.

3260 World Highways %$Linker: 2 Internal <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 19290 0 oLinkExternal reported in November Visit &quot;algerian highway deals being planned&quot; page false /categories/auctions-equipment-supply-servicing-finance/news/algerian-highway-deals-being-planned/ false false%> that the package for the 84km section connecting Annaba with the Tunisian border via the El-Tarf province was allocated to two national groupings. The work was previously being done by the Japanese firm Cojaal.

The Ministry for Public Works said in November that tolling on the East-West Highway will start before the end of 2015. A study is underway to determine how charges can be based on the maintenance and management costs of the link.

For more information on companies in this article

Related Content

  • VIDEO: Switzerland’s Astra Bridge concept to be tendered
    May 23, 2019
    Switzerland will soon tender for companies to build and supply a mobile system for physically shifting traffic away from road crews – the Astra Bridge concept. The federal highways agency - FEDRO - will be asking general contractors to submit bids starting this summer for the Astra Bridge system, according to the agency. The system, to be used on motorways, includes ramp sections at each end of what amounts to a train of elevated connected road sections. Vehicles run onto the top of the train which is
  • High mobility is claimed for CIFA’s concrete plant
    February 7, 2013
    High mobility is claimed for CIFA’s mobile concrete batching plant, the CIFAMOBILE 50. “This is the first ever CIFA concrete batching plant we’ve built. It’s highly mobile and can be transported on wheels,” said Marco Brambati, director of marketing and business planning at the firm. The machine features a mixer that can produce 1/3 of concrete/cycle. This DNA 1.0 mixer is the smallest in the CIFA range (while the largest has a 3m3 capacity) and can deliver up to 50m3/hour of ready-mixed concrete. The plant
  • VIDEO: Rudolph gets a lift from a skilled excavator operator
    December 21, 2016
    Having trouble getting into that Christmas feeling? Too much taking and not enough giving in the world? Well, one extremely skilled excavator operator in the US did hit bit to change all that. He extended a helping hand – in reality a bucket - to a baby deer trapped head-deep in mud on an extremely wet construction site. The operator used his skills to gingerly lift the stricken animal to safety. That wasn’t the end of it. There were, in fact, two deer, and the excavator operator rescued the second
  • INTERMAT launch for Komatsu wheeled loaders
    April 19, 2012
    Komatsu used INTERMAT to take the wraps off two new Dash 7 wheeled loaders, badged WA380-7 and WA500-7. With engine emissions being the main driver, the smaller 18-tonne WA380-7 packs 142kW from its EU Stage IIIb engine to deliver improved efficiency and lower fuel consumption. The machine also gets torque converter lock-up with the function operating in 2nd, 3rd and 4th gears, and gives the loader a 40 km/h forward speed.