Skip to main content

Albanian roads upgrade reduces journey times

Albania’s road network will benefit from three new links being built during 2010. These will connect capital Tirana and Klos, Tirana and Elbasan as well as Berat and Tepelena. The new roads will help cut journey times substantially by as much as 50-70% overall. Once the new link is built between Tirana and Elbasan, journey time will be around 20-25 minutes and this project has been designed by an Italian company.
May 15, 2012 Read time: 1 min
Albania’s road network will benefit from three new links being built during 2010. These will connect capital Tirana and Klos, Tirana and Elbasan as well as Berat and Tepelena. The new roads will help cut journey times substantially by as much as 50-70% overall.

Once the new link is built between Tirana and Elbasan, journey time will be around 20-25 minutes and this project has been designed by an Italian company.

The design for the Berat-Tepelena link is being carried by a Kuwaiti company, with some financing for the work also being provided by Kuwait.

Related Content

  • Roads to Recovery after the pandemic
    January 11, 2021
    IRF president Bill Halkias shares the Federation’s view on post-Covid
  • Record attendance for Istanbul’s E&E conference
    June 14, 2012
    The Eurasphalt & Eurobitume 2012 event in Turkey has attracted record attendance figures, although final figures were not available at the time of writing.
  • EIB backing Irish motorway link
    April 30, 2014
    The European Investment Bank (EIB) is providing financial backing worth €144 million for the new M17/M18 Gort-Tuam motorway project. The M17/M18 Gort to Tuam PPP Scheme is situated in the west of Ireland and will be constructed as a four lane motorway that will replace the existing N17/N18 roads. This new motorway will reduce journey times by around 20 minutes and has an overall cost estimated at €550 million. Construction work will start during this year and this is the second transport PPP to be signed un
  • Tajikistan tunnel repair work
    February 11, 2021
    Repair work is planned for Tajikistan’s Istiqlol tunnel.