Skip to main content

Albanian roads upgrade reduces journey times

Albania’s road network will benefit from three new links being built during 2010. These will connect capital Tirana and Klos, Tirana and Elbasan as well as Berat and Tepelena. The new roads will help cut journey times substantially by as much as 50-70% overall. Once the new link is built between Tirana and Elbasan, journey time will be around 20-25 minutes and this project has been designed by an Italian company.
May 15, 2012 Read time: 1 min
Albania’s road network will benefit from three new links being built during 2010. These will connect capital Tirana and Klos, Tirana and Elbasan as well as Berat and Tepelena. The new roads will help cut journey times substantially by as much as 50-70% overall.

Once the new link is built between Tirana and Elbasan, journey time will be around 20-25 minutes and this project has been designed by an Italian company.

The design for the Berat-Tepelena link is being carried by a Kuwaiti company, with some financing for the work also being provided by Kuwait.

Related Content

  • US$690 million for Indonesia toll tunnel
    September 3, 2024
    Funding worth US$690 million is planned for Indonesia’s toll tunnel.
  • Poland's ambitious highway construction plans
    July 10, 2012
    The European football championships are among a number of things pushing Poland's ambitious highway building programme. Patrick Smith reports. Poland is planning to spend a colossal €4.57 billion on road projects in 2009, a 35% increase over the previous year. T
  • Kenya highway link upgrade planned
    June 19, 2017
    Plans are moving forward with regard to the upgrade work to the highway connecting Kenya’s capital Nairobi with the port of Mombasa.
  • Third section of Moscow ring road project
    August 10, 2017
    Financing is being secured for the project to build the third section of Moscow’s ring road. A loan worth around US$642 million will be provided by three banks, the Sberbank, Gazprombank and Eurasian Development Bank (EDB). This section of the ring road lies to the north of the city and measures 105.3km long. The loan for the PPP toll road will be for a 16-year period with the building work being carried out by the Road Construction Corporation. The ring road forms an important link in the chain for the roa