Skip to main content

Albanian roads upgrade reduces journey times

Albania’s road network will benefit from three new links being built during 2010. These will connect capital Tirana and Klos, Tirana and Elbasan as well as Berat and Tepelena. The new roads will help cut journey times substantially by as much as 50-70% overall. Once the new link is built between Tirana and Elbasan, journey time will be around 20-25 minutes and this project has been designed by an Italian company.
May 15, 2012 Read time: 1 min
Albania’s road network will benefit from three new links being built during 2010. These will connect capital Tirana and Klos, Tirana and Elbasan as well as Berat and Tepelena. The new roads will help cut journey times substantially by as much as 50-70% overall.

Once the new link is built between Tirana and Elbasan, journey time will be around 20-25 minutes and this project has been designed by an Italian company.

The design for the Berat-Tepelena link is being carried by a Kuwaiti company, with some financing for the work also being provided by Kuwait.

Related Content

  • Kosovo opens highway connection to Albania
    November 26, 2013
    An official opening has been carried out in Kosovo of the new highway connecting the country with neighbouring Albania.
  • Serbia upgrading infrastructure
    May 2, 2012
    Serbia has managed to reduce the cost of building the Corridor 10 highway by €80 million. These funds will instead be used to pay for upgrades and improvements needed for the second section of the highway project, close to Neradovci. So far some 180km of the Corridor 10 highway has been built over a 40 month time frame. A further 150km of the highway has still to be built. Work on the Corridor 10 motorway is also being financed by the European Bank for Reconstruction and Development and the state budget. Wh
  • Serbia upgrading infrastructure
    March 16, 2012
    Serbia has managed to reduce the cost of building the Corridor 10 highway by €80 million. These funds will instead be used to pay for upgrades and improvements needed for the second section of the highway project, close to Neradovci.
  • Plans in hand for Uganda’s key highway upgrade
    July 25, 2014
    In Uganda planning is underway for the upgrade of the Kampala-Jinja route. Preparations are being made for a new tolled highway connecting with capital Kampala. The upgrade will see the route being widened with four lanes for much of the length, six lanes on the approach to Kampala and up to eight lanes where vehicle densities will be heaviest to carry the capital’s traffic. The construction work is expected to cost some US$74 million and the new link will connect with the existing Kampala-Entebbe highway.