Skip to main content

Albania tackles highway costs

The Albanian Government has reduced its estimate for the cost of the new road link between capital Tirana and Elbasan. This $110 million reduction sees the project now costing an expected $290 million, instead of the $400 million originally forecast.
March 23, 2012 Read time: 1 min
The Albanian Government has reduced its estimate for the cost of the new road link between capital Tirana and Elbasan. This $110 million reduction sees the project now costing an expected $290 million, instead of the $400 million originally forecast. The highway is being financed jointly by Albania and the 4216 Abu Dhabi Fund for Development.

For more information on companies in this article

Related Content

  • Tackling Florida highway congestion
    October 4, 2016
    Congestion is a major problem in certain areas of US state Florida. Large number of commuters and tourists means that central Florida’s Interstate 4 (I-4) highway suffers particularly from congestion. Its proximity to Disneyland means that the traffic often comes to a complete standstill.
  • Tackling Florida’s highway congestion
    August 5, 2016
    Congestion is a major problem in certain areas of US state Florida. Large number of commuters and tourists means that central Florida’s Interstate 4 (I-4) highway suffers particularly from congestion. Its proximity to Disneyland means that the traffic often comes to a complete standstill. A 2012 report from the Texas Transportation Institute ranked Orlando 13th in the US for traffic congestion, with more than 1.5 million daily trips on I-4. The report estimates that each frustrated commuter wastes about 45
  • Philippines highway construction due to start
    August 10, 2018
    Construction will commence on the North Luzon Expressway (NLEX) connector road in the Philippines in early 2019.
  • Leaks hit Czech Blanka Tunnel and boost costs
    July 26, 2013
    Further problems have hit the Blanka Tunnel in Czech capital Prague. The link has been hit by a series of delays and is now suffering from leaks. The project is costing €1.43 billion and is due to open in May 2014. The company building the tunnel Metrostav, has stated that the leaks are likely to be temporary and should be dealt with by the time the link opens to traffic, when it will become part of the Prague ring road. Construction work started on the tunnel in 2007 but the project has faced a series of p