Skip to main content

Albania-Kosovo connect

Tunnel workers have now connected the two bores for the new highway linking Albania with Kosovo. The 5.6km tunnel forms part of the Rreshen-Kalimash highway, which has so far cost Albania in excess of €1 billion.
July 12, 2012 Read time: 1 min
Tunnel workers have now connected the two bores for the new highway linking Albania with Kosovo. The 5.6km tunnel forms part of the Rreshen-Kalimash highway, which has so far cost Albania in excess of €1 billion.

Related Content

  • Breakthrough on Slovakia’s D1 tunnel near Zilina
    December 12, 2016
    Workers in Slovakia have broken through the first of two passages in a tunnel near Zilina as part of an 11km D1 highway project. Breakthrough of the second passage of the tunnel on the section Hricovske Podhradie-Lietavska Lucka will likely be in January. Around 80m are still to be bored, according to a report in the Slovak Spectator on-line newspaper. Zilina is in northwestern Slovakia, around 200km from the capital Bratislava and close to the Czech and Polish borders. Juraj Valent, head of the Na
  • More tenders for the Lower Thames Crossing
    April 2, 2021
    The winners will build 23km of road connecting to what will be the UK’s longest road tunnel.
  • Marão road tunnel construction in Portugal back on track after 2-year halt
    January 22, 2014
    The construction of the Marão road tunnel in Portugal will be resumed in the first half of 2014 – ending a two-year suspension of works due to the financial constraints of the winning Somague-led build consortium. The concession for the tunnel, which, at 5.6km, will be Portugal’s longest road tunnel, is now under the control of the state road agency Estradas de Portugal. Another investment of €150 million (US$ 202.91 million) is required to complete the major infrastructure works, earmarked for completio
  • Marão road tunnel construction in Portugal back on track after 2-year halt
    January 22, 2014
    The construction of the Marão road tunnel in Portugal will be resumed in the first half of 2014 – ending a two-year suspension of works due to the financial constraints of the winning Somague-led build consortium.