Skip to main content

Alaskan bridge project remodelled

In Alaska a decision has been made regarding the Knik Arm Crossing Project, which will now be carried out under the PPP model.
March 1, 2012 Read time: 2 mins
In Alaska a decision has been made regarding the Knik Arm Crossing Project, which will now be carried out under the PPP model. The previous project procurement plan has been cancelled. The Knik Arm Bridge and Toll Authority (3471 KABATA) explained it was decided to restart the procurement process to make it easier to deliver the project and finance the toll bridge.

The PPP model will also provide sufficient for a full maintenance programme to maximise its working life and will also provide a better value for money approach to the state, according to KABATA. The Knik Arm Crossing combines a toll bridge and roadway crossing Cook Inlet between Anchorage, Alaska's largest city, and the Matanuska-Susitna Borough, one of the fastest growing counties in the US.

The Alaska Legislature established the Knik Arm Bridge and Toll Authority in 2003 under Alaska Statute 19.75 to develop, stimulate, and advance the economic welfare of the state and further the development of public transportation systems in the vicinity of Upper Cook Inlet with construction of a bridge to span Knik Arm and connect the Municipality of Anchorage and the Matanuska-Susitna Borough. The project has not been without controversy in the past as it was cited as a ploy to win political support by one group. Under the terms of the deal, the partner selected through the procurement process will receive periodic payments based on the availability of the project at specified performance levels.  Underachievement of the performance criteria would result in reductions to the periodic amount received by the private partner.

For more information on companies in this article

Related Content

  • Julián Núñez, head of ASECAP offers a little Spanish enlightenment
    May 1, 2018
    Julián Núñez, president of ASECAP, gets his teeth into the vision of a European strategy for toll roads. David Arminas reports from Madrid Getting European politicians to agree to a long-term cross-border highway infrastructure programme for toll roads is extremely difficult. It’s a bit like pulling teeth. People want to avoid the pain. This is perhaps a bad analogy to use in the case of Julián Núñez, president of ASECAP - European Association of Operators of Toll Road Infrastructures. Núñez had just sat
  • Beyond cost: forging a solutions-led partnership for highways carbon-saving
    December 30, 2024
    Changing highways procurement is increasingly focusing material specification to drive carbon savings as well as cost. A longstanding partnership between Huyton Asphalt and Tarmac is delivering new solutions for highways clients in the UK.
  • Polish project causes further legal headaches
    February 28, 2012
    The long tale of woe concerning Poland's troubled A2 highway project looks set to continue with the latest developments in the case.
  • Make the case for electronic tolling, ASECAP conference delegates heard
    September 14, 2015
    Mobility pricing and electronic tolling is the future, delegates to a recent ASECAP Study Days conference, reports Geoff Hadwick at the Lisbon event. The international road tolling industry is failing to make its case and the sector is losing out to other social and political lobby groups. As a result, “tolling is still on the sidelines”, according to the head of the Washington-based International Bridge, Tunnel and Turnpike Association. IBTTA chief executive Pat Jones issued his stark warning at the