Skip to main content

Alabama highway project - cost increases

Questions are being asked in the US State of Alabama over additional funding being required for an 83km stretch of road.
February 17, 2012 Read time: 1 min
Questions are being asked in the US State of Alabama over additional funding being required for an 83km stretch of road. When the estimates for the Northern Beltline bypass connecting Interstate 20/59 with the 1/59 in southwest Jefferson County was announced in 2009 the project was expected to cost US$3 billion. However the project is now thought to cost $4.7 billion with the existing plans and there are concerns that the price may rise further. Materials costs have risen considerably since the project was first mooted although other cost increases have also affected the plans. Delays may hit the project but it still looks likely to go ahead.

Related Content

  • £8 billion UK tunnel project to go ahead
    January 30, 2025
    The £8 billion UK Lower Thames Crossing tunnel project is to go ahead.
  • Zimbabwe highway project faces delay
    July 12, 2018
    The project to build Zimbabwe’s crucial north-south highway link is facing delays, with the contract now having to be re-awarded. The tender was originally awarded to an Austrian firm, Geiger International, but with progress having proven very slow this has been withdrawn. The deal has not yet been re-awarded. But the Zimbabwe Government is at present in discussions with the second bidder from the original tender process, Anhui Foreign Economic Construction Group Limited (AFECC), over the contract. The hig
  • Stonehenge tunnel going ahead?
    September 12, 2017
    The preferred route has been announced for a new road and tunnel link on the A303 route in the UK that will bypass the famous Stonehenge stone circle. The project now finally looks as if it might go ahead after years of debate, although several hurdles have yet to be passed. The work calls for the construction of a new 13km dual carriageway link and includes a 2.6km stretch of tunnel. The new route will be located further away from Stonehenge and the tunnel is being built
  • Ukraine’s shattered highways
    July 26, 2024
    With no end to its war with Russia in sight, Ukraine is also fighting hard to cope with a growing backlog of major infrastructure projects, especially in terms of rebuilding the country’s roads and bridges. David Arminas reports.