Skip to main content

AGS demonstrates the power of its new 3D application for the ID4 anti-collision crane safety management system

Crane and site safety management specialist AGS, which also makes and supplies elevated obstruction lighting , anemometers and anti-collision systems, will use Bauma to demonstrate its new 3D application for the ID4 anti-collision crane management system. AGS has more than 5,000 systems in use on construction sites around the world and it has a long-term strategic partnership agreement with Bouygues Construction. The group will also announce the setting up of three new subsidiaries in Rhône-Alpes, Île-de-Fr
March 27, 2013 Read time: 1 min
Crane and site safety management specialist 7241 AGS, which also makes and supplies elevated obstruction lighting , anemometers and anti-collision systems, will use 688 Bauma to demonstrate its new 3D application for the ID4 anti-collision crane management system. AGS has more than 5,000 systems in use on construction sites around the world and it has a long-term strategic partnership agreement with 979 Bouygues Construction. The group will also announce the setting up of three new subsidiaries in Rhône-Alpes, Île-de-France and Provence-Alpes-Côte d'Azur.

Stand: F12.1208/1

%$Linker: 2 Asset <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 83034 0 oLinkExternal www.AGS-BTP.com www.AGS-BTP.com false /EasySiteWeb/GatewayLink.aspx?alId=83034 false false%>

 

%$Linker: 2 Internal <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 11560 0 oLinkInternal <span class="oLinkInternal"><span class="oLinkInternal">View more videos</span></span> Video false /event-news/bauma-2013/video/ true false%>

For more information on companies in this article

Related Content

  • World premiere for Kobelco’s heavy-duty crane models
    April 18, 2013
    Kobelco Cranes is introducing three brand new heavy-duty cranes in response to global customer demand. The releases include two new crawler cranes with telescopic booms in the 75tonne class –models TK750S and TK750FS – and one new 120tonne heavy-duty foundation crawler crane with lattice boom; the BMS1200HD. Both the TK750FS and the TK750S are equipped with a 235kW diesel engine to provide the rugged power for the foundation job. This strong engine can also be found in 250tonne lattice boom crawler cranes
  • Peri launched UP MDS Formwork at INTERMAT 2012
    January 6, 2017
    Peri is unveiling its new UP MDS shoring tower to all markets outside France at INTERMAT 2012. The shoring tower is equipped with working platforms hanging from the handrails, providing a high level of security during the erection and dismantling phases, and a significantly reduced exposure to musculoskeletal disorders (MSDs). The working platform sets an automatic working position 1m below the handrail and follows the top of the tower. The system improves productivity by optimising weight (total weight of
  • Peri launched UP MDS Formwork at INTERMAT 2012
    February 3, 2012
    Peri is unveiling its new UP MDS shoring tower to all markets outside France at INTERMAT 2012. The shoring tower is equipped with working platforms hanging from the handrails, providing a high level of security during the erection and dismantling phases, and a significantly reduced exposure to musculoskeletal disorders (MSDs). The working platform sets an automatic working position 1m below the handrail and follows the top of the tower. The system improves productivity by optimising weight (total weight of
  • Topcon and DynaRoad announce major software upgrade
    January 6, 2017
    Topcon Positioning Group and DynaRoad Oy of Helsinki, Finland, have announced the release of DynaRoad 5.3 construction planning and control software.

 Juuso Makinen, CEO of DynaRoad Oy, said, “One of the largest project management challenges is collecting real-time information from large sites and comparing it to plans. We’re excited to be the first ones offering a solution to this.” DynaRoad claims to be the first software in the world to automatically monitor, update, and report schedule progress of eart