Skip to main content

AGS demonstrates the power of its new 3D application for the ID4 anti-collision crane safety management system

Crane and site safety management specialist AGS, which also makes and supplies elevated obstruction lighting , anemometers and anti-collision systems, will use Bauma to demonstrate its new 3D application for the ID4 anti-collision crane management system. AGS has more than 5,000 systems in use on construction sites around the world and it has a long-term strategic partnership agreement with Bouygues Construction. The group will also announce the setting up of three new subsidiaries in Rhône-Alpes, Île-de-Fr
March 27, 2013 Read time: 1 min
Crane and site safety management specialist 7241 AGS, which also makes and supplies elevated obstruction lighting , anemometers and anti-collision systems, will use 688 Bauma to demonstrate its new 3D application for the ID4 anti-collision crane management system. AGS has more than 5,000 systems in use on construction sites around the world and it has a long-term strategic partnership agreement with 979 Bouygues Construction. The group will also announce the setting up of three new subsidiaries in Rhône-Alpes, Île-de-France and Provence-Alpes-Côte d'Azur.

Stand: F12.1208/1

%$Linker: 2 Asset <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 83034 0 oLinkExternal www.AGS-BTP.com www.AGS-BTP.com false /EasySiteWeb/GatewayLink.aspx?alId=83034 false false%>

 

%$Linker: 2 Internal <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 11560 0 oLinkInternal <span class="oLinkInternal"><span class="oLinkInternal">View more videos</span></span> Video false /event-news/bauma-2013/video/ true false%>

For more information on companies in this article

Related Content

  • VIDEO: Car owner’s manual – chapter one, snake removal
    October 26, 2016
    Snakes can get into the darnedest places, such as your car. The issue then becomes how to get it out. The answer is, with a lot of work and care as well as an equal amount of patience, such as possessed by the man in this video shot somewhere possibly in Southeast Asia Getting a small snake out of a car is tough. Getting a large one out is practically impossible - at least extracting the reptile in one piece and alive is.
  • Link-Belt unveils the next generation of its RTC-80110 Series II large rough terrain crane series
    January 6, 2017
    merican crane builder Link-Belt will be showing off the latest in its line of mid-range rough terrain cranes at Bauma, the RTC-8080 Series II, which offers a fully-powered, four-section, 38.7 m (127 ft) long main boom. The RTC-8080 Series II has a two-mode telescope proportioning system known as A-max and three on-board fly options allow operators to use at least four manual offset positions fixed at 2, 15, 30, and 45 degrees. One of the three on-board fly offerings is a 3-piece, bi-fold lattice fly, which
  • Link-Belt unveils the next generation of its RTC-80110 Series II large rough terrain crane series
    March 27, 2013
    merican crane builder Link-Belt will be showing off the latest in its line of mid-range rough terrain cranes at Bauma, the RTC-8080 Series II, which offers a fully-powered, four-section, 38.7 m (127 ft) long main boom. The RTC-8080 Series II has a two-mode telescope proportioning system known as A-max and three on-board fly options allow operators to use at least four manual offset positions fixed at 2, 15, 30, and 45 degrees. One of the three on-board fly offerings is a 3-piece, bi-fold lattice fly, which
  • VIDEO footage shows bridge replacement project in Rhode Island
    October 10, 2014
    A time-lapse video has been released showing the rapid replacement of the Barton Corner Bridge in Rhode Island in the US. Rhode Island Department of Transportation (RIDOT) partnered with EarthCam to document the US$6.4 million rapid replacement of the Barton Corner Bridge. The construction project was completed during an 11-day period in August 2014 and can be seen in an exclusive time-lapse, released by RIDOT. Had RIDOT had used conventional methods, the bridge replacement would have taken two full constru