Skip to main content

Accurate load weighing system from Loadrite

The Loadrite L2150 wheeled loader bucket weighing system is said to offer increased accuracy and reliability. The system is said to ensure haul trucks can be loaded properly, improving overall productivity by ensuring operational efficiency. Using this weighing system trucks are neither under-loaded nor over-loaded, with the ensuing associated productivity losses and excess machine wear problems respectively, all but eliminated. Aimed at use in large quarry operations the new Loadrite L2150 unit is said to
January 6, 2017 Read time: 2 mins
Loadrite says its new weighing system offers speed of measurement and accuracy
The 5004 Loadrite L2150 wheeled loader bucket weighing system is said to offer increased accuracy and reliability. The system is said to ensure haul trucks can be loaded properly, improving overall productivity by ensuring operational efficiency. Using this weighing system trucks are neither under-loaded nor over-loaded, with the ensuing associated productivity losses and excess machine wear problems respectively, all but eliminated. Aimed at use in large quarry operations the new Loadrite L2150 unit is said to be tough and dependable and provides extensive data capture capabilities. The firm does also offer more basic bucket weighing units for smaller wheeled loaders. In addition, the company claims its X2350 bucket weighing system for excavators can provide accurate measurements and without slowing operations. The company also supplies a sophisticated conveyor load weighing system that can help optimise tonnes/hour and maximise utilisation and uptime. The conveyor system ensures optimum loads on conveyors can be maintained, maximising productivity through a plant and also reducing the risk of premature component wear, potential failures and additional downtime for repairs.

Stand: C2.121

%$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal www.LoadriteScales.com www.LoadriteScales.com false http://www.loadritescales.com/ false false%>

For more information on companies in this article

Related Content

  • Erlau’s Sideflex tyre protection system deflects rock debris away from tyres
    January 6, 2017
    Identifying the cost and downtime caused by damaged sidewalls on dumptrucks used in mining and quarry applications, Erlau has developed the Sideflex tyre protection system, which is claimed to be capable of deflecting rock debris away from tyre walls. Using bolt-on segments that form an Armadillo-like layer of protection covering the outer sidewall of an earthmoving tyre, Sideflex affords high-speed use, unlike traditional tyre chain protection systems, which offer limited speeds in use. “Comprehensive tyre
  • Erlau’s Sideflex tyre protection system deflects rock debris away from tyres
    April 18, 2013
    Identifying the cost and downtime caused by damaged sidewalls on dumptrucks used in mining and quarry applications, Erlau has developed the Sideflex tyre protection system, which is claimed to be capable of deflecting rock debris away from tyre walls. Using bolt-on segments that form an Armadillo-like layer of protection covering the outer sidewall of an earthmoving tyre, Sideflex affords high-speed use, unlike traditional tyre chain protection systems, which offer limited speeds in use. “Comprehensive tyre
  • Advanced high reach capability from Haulotte’s latest access plaform
    January 6, 2017
    According to Haulttoe, its new HT 23 RTJ platform offers a wider working envelope than previous designs in its size class. Platform working height is 22.5m, while its horizontal outreach is 18.3m, around 1m higher than competing units. A dual load system is available as an option, allowing a lifting capacity up to 450kg while the machine is said to offer a high lifting speed, taking just 56 seconds to reach full height and increasing its productivity in this product segment. It also offers high manoeuvrabi
  • Advanced high reach capability from Haulotte’s latest access plaform
    January 31, 2013
    According to Haulttoe, its new HT 23 RTJ platform offers a wider working envelope than previous designs in its size class. Platform working height is 22.5m, while its horizontal outreach is 18.3m, around 1m higher than competing units. A dual load system is available as an option, allowing a lifting capacity up to 450kg while the machine is said to offer a high lifting speed, taking just 56 seconds to reach full height and increasing its productivity in this product segment. It also offers high manoeuvrabi