Skip to main content

Abertis owed US$1.39bn from Spanish government for AP-7 Catalonia expansion

The debt owed by the Spanish Government’s Ministry of Works to infrastructure firm, Abertis, for the expansion of the AP-7 road in Catalonia stood at €1.07 billion (US$1.39bn) by the end of 2012 – an increase of 40.7% in just one year. The concession firm, Acesa, which is part of the Abertis group, signed an agreement with the Government in 2006 to add an additional carriageway on certain stretches of the highway, with the toll system also being changed to a payment model on exit instead of central tolls. T
March 6, 2013 Read time: 2 mins
The debt owed by the Spanish Government’s Ministry of Works to infrastructure firm, 5729 Abertis, for the expansion of the AP-7 road in Catalonia stood at €1.07 billion (US$1.39bn) by the end of 2012 – an increase of 40.7% in just one year.

The concession firm, Acesa, which is part of the Abertis group, signed an agreement with the Government in 2006 to add an additional carriageway on certain stretches of the highway, with the toll system also being changed to a payment model on exit instead of central tolls. Total investment was expected at €500 million ($651.7mn), a figure which was reached in 2012. The agreement set out that Abertis could expand the highway as the increase in traffic would allow it to recover the investment by the end of the concession. However, if the traffic volume forecasts are not met by the end of the concession in 2021, it would be paid compensation by the Ministry of Works. Since 2008 there have been declines in traffic volumes, rather than the forecast 3% annual growth. This currently means that Abertis would need to be paid €1.07 billion (US$1.39bn) as of 31 December 2012. This figure will only fall if the lost traffic is recovered, and, going forwards, traffic was to increase at the predicted rate.

Meanwhile, the operator of the motorway between Madrid and Toledo, which is 15% owned by Espirito Santo Concessoes/Ascendi, is reported to be facing financial difficulties.

For more information on companies in this article

Related Content

  • How Florida paved the way for availability payments in the US
    November 21, 2014
    New financing models have been used to deliver key transport links in the US - * Patrick D Harder and Brandon J Davis Florida Department of Transportation’s (FDOT) public-private partnership (PPP) programme has made impressive progress, setting precedents for US transportation planning and funding. On March 26th 2014, FDOT opened 16km of new reversible express lanes as part of its US$1.8 billion I-595 Corridor Roadway Improvements Project. Just a few months later, on August 3rd 2014, FDOT opened twin tunnel
  • Nationalisation plan for Madrid motorways
    July 2, 2012
    The Spanish Ministry of Development is considering nationalising the loss-making radial motorways in Madrid through state-owned company Seittsa. The plan would involve putting in place a toll-payment system to generate revenues to pay interests on debts and maintenance of the roads. The Ministry has already detected 600 locations where remote controlled payment systems could be installed in Madrid to charge those using the roads. The same plan includes a project to nationalise all motorways in Madrid at ris
  • Highway 407 Revisited – smart tollroad extension
    June 7, 2016
    In the late 1990s, World Highways published a supplement on construction of Canada’s Highway 407, the world’s first all-electronic toll road. But how successful has it been? David Arminas reports from Toronto The head office for 407 ETR Concession Company is a low-rise building next to exit 59, just north of Toronto, Canada’s economic powerhouse. The building may be non-descript but inside is the advanced technical heart of Highway 407 ETR – Express Toll Route. It houses the latest toll monitoring techno
  • Contractor Strabag reports strong performance
    April 30, 2013
    Austrian contractor STRABAG reports healthy earnings before interest and taxes (EBIT) of €207 million in 2012. This figure beats the firm’s own expectations and the expectations of the market. Net income after minorities stood at €61 million, showing an expected considerable decrease of 66.67% compared to the year before. “An output volume of €14 billion in 2012 – that’s nothing to complain about. With €13.2 billion, the end-of-the-year order backlog is also nearly exactly at the pre-crisis level of 2008, s