Skip to main content

A1 Poland contract worth over €238.4mn signed by GDDKiA and consortium

Polish road authority GDDKiA has signed a contract with a consortium of Salini Polska, Przedsibiorstwo Budowy Drógi Mostów Kobylarnia and Impreglio for completing two sections of the A1 motorway. The combined value of two sections (Brzezie- Kowal and Czerniewice-Brzezie) stands at over €238.24 million (PLN 1bn). The works are due to start in the second quarter of 2013, with the completion expected to take 11 months on the Czerniewice-Brzezie section, and a year on the Kowal-Brzezie stretch.
April 10, 2013 Read time: 1 min
Polish road authority 1361 GDDKiA has signed a contract with a consortium of Salini Polska, Przedsibiorstwo Budowy Drógi Mostów Kobylarnia and Impreglio for completing two sections of the A1 motorway.

The combined value of two sections (Brzezie- Kowal and Czerniewice-Brzezie) stands at over €238.24 million (PLN 1bn). The works are due to start in the second quarter of 2013, with the completion expected to take 11 months on the Czerniewice-Brzezie section, and a year on the Kowal-Brzezie stretch.

For more information on companies in this article

Related Content

  • Poland: A1 tender attracts 11 offers, including one from Strabag
    February 19, 2015
    Construction of a 15.2km section of Poland’s A1 motorway has attracted 11 bids. A Strabag consortium made the lowest bid for the section, between Pyrzowice and Rzasawa, coming in at €146 million. A consortium formed by Polaqua and Dragados was the second lowest, at €156.4 million. The highest bid was €183.4 million. The contract calls for a construction period of 30 months. Meanwhile, the province of Mazowsze, or Masovia, with its 5.5 million inhabitants and the capital Warsaw, will get nearly €2.1 billion
  • Upgrading Poland's roads for UEFA 2012
    May 2, 2012
    Championships in 2012. With plans in place to cohost the UEFA 2012 football championships with the Ukraine, Poland's road infrastructure is undergoing major developments to bring it up to date with the rest of the European Union. And to ensure the completed roads and pavements meet the required quality standards, Cooper Technology of Derby, UK, was awarded a contract to provide asphalt testing equipment to
  • Upgrading Poland's roads for UEFA 2012
    May 2, 2012
    Championships in 2012. With plans in place to cohost the UEFA 2012 football championships with the Ukraine, Poland's road infrastructure is undergoing major developments to bring it up to date with the rest of the European Union. And to ensure the completed roads and pavements meet the required quality standards, Cooper Technology of Derby, UK, was awarded a contract to provide asphalt testing equipment to
  • Upgrading Poland's roads for UEFA 2012
    February 7, 2012
    POLAND has ambitious plans to construct around 900km of new highways in time for the European Football Championships in 2012. With plans in place to cohost the UEFA 2012 football championships with the Ukraine, Poland's road infrastructure is undergoing major developments to bring it up to date with the rest of the European Union. And to ensure the completed roads and pavements meet the required quality standards, Cooper Technology of Derby, UK, was awarded a contract to provide asphalt testing equipment to