Skip to main content

$238 million Florida road deal for Lane

Lane Construction has been awarded a $238 million Florida road project.
By MJ Woof July 25, 2025 Read time: 2 mins
Lane Construction will carry out upgrade work for I-95 in Northern Florida for FDOT – image courtesy of RK&K


Lane Construction will handle the $238 million upgrade project for a stretch of I-75 in Florida. The 12.8km stretch of I-75 is in Marion County in Northern Florida and the project was awarded to Lane Construction, the US Webuild subsidiary, by the Florida Department of Transportation. The project forms part of the Moving Florida Forward Infrastructure intended to improve road infrastructure across the state. This package of works follows close behind the award of a project for Lane Construction by North Carolina Department of Transportation for upgrade work to a stretch of I-85 close to Charlotte.

The work will see the stretch of highway benefiting from a significant increase in capacity as well as improved safety for drivers in the event of emergency evacuations. Boosting capacity will cut traffic delays by 96% in the northbound direction and 88% in the southbound direction. Work on the project will commence in 2026 and is expected to take three years to complete.

The project will deliver new auxiliary lanes between the I-75 interchanges for SR 200 and SR 326. One existing bridge will be replaced while two new bridges will be built, along with a new interchange at 49th Street. Safety upgrades will be made for the three interchanges with SR 40, US 27 and SR 326. In addition, drainage systems will be improved, while noise abatement measures will be constructed.

Lane Construction is carrying out several projects in Florida already including the I-275/I-4 Downtown Tampa Interchange (DTI) project, the Seminole Expressway/SR 417 Widening project in Seminole County and the I-4 at SR 33 Interchange project in Polk County. They also include the Turnpike Mainline Widening project in Lake County, the interchanges between the I-4 and Sand Lake Road, and the I-4 and the SR 535 in Orange County.  

 

For more information on companies in this article

Related Content

  • Cutting congestion in California with highway works
    December 15, 2023
    New California highway projects will help reduce congestion.
  • Parsons is handling a major interchange project in North Carolina
    June 21, 2017
    Parsons is handling the design for a major interchange project in North Carolina. The firm will carry out key elements of design for the I-26/US 74/NC 108 Interchange Project. The deal was awarded by the North Carolina Department of Transportation (NCDOT).
  • Key SR-91 highway upgrade underway in California
    December 16, 2013
    In the US state of California, construction is now underway for the State Route 91 (SR-91) Corridor Improvement Project. This improved section for SR-91 will run through the Corona and Riverside, both of which are located in Riverside County. The project will extend the SR-91 Tolled Express Lanes in Orange County into Riverside County, a distance of 17.6km. This includes a 13km stretch into Riverside County on SR-91, with a 5km flyover connecting to Interstate 15 from SR-91. Riverside County Transportation
  • Oklahoma turnpike project for Atkins
    December 20, 2017
    Atkins, part of the SNC-Lavalin Group, is providing construction management services for the Oklahoma Turnpike Authority (OTA).