Skip to main content

$238 million Florida road deal for Lane

Lane Construction has been awarded a $238 million Florida road project.
By MJ Woof July 25, 2025 Read time: 2 mins
Lane Construction will carry out upgrade work for I-95 in Northern Florida for FDOT – image courtesy of RK&K


Lane Construction will handle the $238 million upgrade project for a stretch of I-75 in Florida. The 12.8km stretch of I-75 is in Marion County in Northern Florida and the project was awarded to Lane Construction, the US Webuild subsidiary, by the Florida Department of Transportation. The project forms part of the Moving Florida Forward Infrastructure intended to improve road infrastructure across the state. This package of works follows close behind the award of a project for Lane Construction by North Carolina Department of Transportation for upgrade work to a stretch of I-85 close to Charlotte.

The work will see the stretch of highway benefiting from a significant increase in capacity as well as improved safety for drivers in the event of emergency evacuations. Boosting capacity will cut traffic delays by 96% in the northbound direction and 88% in the southbound direction. Work on the project will commence in 2026 and is expected to take three years to complete.

The project will deliver new auxiliary lanes between the I-75 interchanges for SR 200 and SR 326. One existing bridge will be replaced while two new bridges will be built, along with a new interchange at 49th Street. Safety upgrades will be made for the three interchanges with SR 40, US 27 and SR 326. In addition, drainage systems will be improved, while noise abatement measures will be constructed.

Lane Construction is carrying out several projects in Florida already including the I-275/I-4 Downtown Tampa Interchange (DTI) project, the Seminole Expressway/SR 417 Widening project in Seminole County and the I-4 at SR 33 Interchange project in Polk County. They also include the Turnpike Mainline Widening project in Lake County, the interchanges between the I-4 and Sand Lake Road, and the I-4 and the SR 535 in Orange County.  

 

For more information on companies in this article

Related Content

  • New US$534 million tollway for Illinois
    December 2, 2024
    A new US$534 million tollway for Illinois will link to O’Hare International Airport.
  • Lane picks up Florida SR408 widening project in Orange County
    July 18, 2017
    Lane Construction Corporation has won a US$76 million contract to widen a section of State Road 408 in Orange County, Florida.The project entails adding a thirds lane to each carriageway over a 5.2km stretch of SR408. It will also involve widening a ramp from two lanes to three lanes, adding sound walls as well as extra open road tolling - ORT - lanes.
  • Norwegian road contract awarded
    April 21, 2023
    An important Norwegian road contract has been awarded.
  • Florida replacing Howard Frankland Bridge
    August 22, 2018
    Florida Department of Transportation (FDOT) is working on plans to replace the Howard Franklin Bridge. The project is now expected to cost US$814 million, an increase from the $750 million originally envisaged. The contract is expected to be awarded in 2019, with construction commencing in 2020. The first stage of the project should be ready for use in 2024, providing a significant increase in daily capacity and boosting the emergency evacuation capacity also. The new bridge will carry four lanes of traffi