Skip to main content

$238 million Florida road deal for Lane

Lane Construction has been awarded a $238 million Florida road project.
By MJ Woof July 25, 2025 Read time: 2 mins
Lane Construction will carry out upgrade work for I-95 in Northern Florida for FDOT – image courtesy of RK&K


Lane Construction will handle the $238 million upgrade project for a stretch of I-75 in Florida. The 12.8km stretch of I-75 is in Marion County in Northern Florida and the project was awarded to Lane Construction, the US Webuild subsidiary, by the Florida Department of Transportation. The project forms part of the Moving Florida Forward Infrastructure intended to improve road infrastructure across the state. This package of works follows close behind the award of a project for Lane Construction by North Carolina Department of Transportation for upgrade work to a stretch of I-85 close to Charlotte.

The work will see the stretch of highway benefiting from a significant increase in capacity as well as improved safety for drivers in the event of emergency evacuations. Boosting capacity will cut traffic delays by 96% in the northbound direction and 88% in the southbound direction. Work on the project will commence in 2026 and is expected to take three years to complete.

The project will deliver new auxiliary lanes between the I-75 interchanges for SR 200 and SR 326. One existing bridge will be replaced while two new bridges will be built, along with a new interchange at 49th Street. Safety upgrades will be made for the three interchanges with SR 40, US 27 and SR 326. In addition, drainage systems will be improved, while noise abatement measures will be constructed.

Lane Construction is carrying out several projects in Florida already including the I-275/I-4 Downtown Tampa Interchange (DTI) project, the Seminole Expressway/SR 417 Widening project in Seminole County and the I-4 at SR 33 Interchange project in Polk County. They also include the Turnpike Mainline Widening project in Lake County, the interchanges between the I-4 and Sand Lake Road, and the I-4 and the SR 535 in Orange County.  

 

For more information on companies in this article

Related Content

  • Peru highway bridge replacement project
    July 11, 2025
    A Peruvian highway bridge replacement project is required.
  • Utah key highway connection project
    February 23, 2018
    Work is now complete for the second phase of the Mountain View Corridor project in the US state of Utah. The 4km greenfield roadway runs from 5400 South to 4100 South in West Valley City. The project was designed and built jointly by Michael Baker International, Ralph L Wadsworth and Staker Parsons. Phase two of the Mountain View Corridor project included 14 mainline bridges, as well as seven pedestrian bridges and intersection reconstruction, and vital safety improvements to accommodate growth in Salt Lake
  • Israel's new tunnel project
    April 20, 2012
    The Israel National Roads Company is opening the tender process for the project to drive new tunnels on Road no 1.
  • Moveable barrier cuts costs, aids motorists
    February 20, 2012
    Work on an award-winning US bridge was completed with savings and benefits to motorists through the help of an innovative barrier. The bridge replacement of US 31 over I-465 and Lick Creek in southern Indianapolis, state capital of Indiana, won the 2011 Honor Award from the American Council of Engineering Companies of Indiana. Stephen J. Christian & Associates of Indianapolis completed the design in less than nine months to allow Indiana Department of Transportation (INDOT) to take advantage of the favourab