Skip to main content

$1.56 billion Vietnam expressway expansion delayed

A $1.56 billion expressway expansion project in Vietnam is delayed.
By MJ Woof July 7, 2025 Read time: 2 mins
Upgrade work for the expressway linking Ho Chi Minh City with Trung Luong and My Thuan is being delayed – image courtesy of © Pipop oosarakumwadi| Dreamstime.com

Related Content

  • Delhi raised expressway proposed
    March 20, 2025
    A new raised expressway is being proposed for India’s capital, Delhi.
  • New transport links for Vietnam’s key cities
    May 31, 2019
    Both Ho Chi Minh City (HCMC) and Hanoi in Vietnam are to benefit from new transport infrastructure. For HCMC, as much as $39.6 billion will be required to deliver all of the 85 transport infrastructure projects being planned. Severe congestion and flooding are frequent problems causing major traffic hold-ups. Of the 85 transport projects needed for the city, 15 are for the construction of new roads while 55 are for road/bridge works. A further eight are for rail links and seven for waterways. Meanwhile in
  • Vietnam expressway deal moving forward
    January 16, 2019
    A pre-feasibility study is being planned for Vietnam’s Hoa Binh-Moc Chau Expressway project. Construction of the expressway is expected to cost US$857.4 million, with the work being handled under the PPP model. The 85km is planned to feature two lanes in either direction. Construction of the expressway is expected to reduce journey times between Hanoi and Son La, close to the border with Laos, from six hours at present, to just 2.5 hours in the future.
  • US$1.43 billion tolled expressway for Jakarta, Indonesia
    November 21, 2024
    A US$1.43 billion tolled expressway is planned for Jakarta, Indonesia.