Skip to main content

$1.56 billion Vietnam expressway expansion delayed

A $1.56 billion expressway expansion project in Vietnam is delayed.
By MJ Woof July 7, 2025 Read time: 2 mins
Upgrade work for the expressway linking Ho Chi Minh City with Trung Luong and My Thuan is being delayed – image courtesy of © Pipop oosarakumwadi| Dreamstime.com

Related Content

  • Hanoi’s new bridge and highway
    December 11, 2024
    Plans in hand for Hanoi’s new bridge and highway.
  • A new bridge for Vietnam’s Ho Chi Minh City
    September 23, 2019
    A new bridge project is being planned for Vietnam’s Ho Chi Minh City (HCMC). The Thu Thiem 4 Bridge will be 2.2km in length and measure 28m wide and has a projected cost of US$223 million. The bridge will span the Saigon River and connect District 2 with Tan Thuan Dong in District 7, featuring three lanes for vehicle traffic in either direction as well as pedestrian facilities. The construction of the bridge is expected to ease journey times in HCMC, which is notorious for its heavy traffic and chronic cong
  • Project plans in Vietnam
    May 30, 2012
    Feasibility studies have been carried out for the No 3 and No 4 beltway projects in Vietnam. The studies were carried out by State-owned firm Transport Engineering Design Inc in the South (TEDI South). These two major beltway projects will require investments pegged at an estimated US$5.35 billion in all and if work goes ahead as planned, the links should be ready for use in 2016. The 148km No 4 beltway will connect Ho Chi Minh City (HCMC) with towns in nearby provinces, such as Ben Luc Town and Trang Bom T
  • Vietnam’s US$1.4 billion expressways for Cao Bang to Lang Son and Hoa Binh
    January 23, 2024
    Vietnam’s US$1.4 billion expressways to connect Cao Bang to Lang Son and transforming Hoa Binh.