Skip to main content

$117 million Rawalpindi ring road project

Work is 50% complete for Rawalpindi’s $117 million ring road in Pakistan
By MJ Woof May 12, 2025 Read time: 1 min
The RRR project in Pakistan should be complete in late 2025 and will help cut journey times in Rawalpindi – image courtesy of © Mortenhuebbe| Dreamstime.com


Construction of Rawalpindi’s ring road project in Pakistan is 50% complete. The 38km route is now costing $117 million to build. The committee of the National Economic Council (ECNEC) of Pakistan approved the revised budget for the project. 

The work includes building five interchanges, a bridge over a railway, two bridges spanning rivers and seven stormwater bridges as well as 11 overpasses, 10 underpasses and 53 culverts. The interchanges are located at Baanth, Chak Beli Khan, Adiala Road, Chakri Road, and Thalian.

The Rawalpindi Ring Road (RRR) project is being built by the Frontier Works Organization (FWO). The RRR is being managed and overseen by the Rawalpindi Development Authority (RDA) via its Project Management Unit (PMU), which was established specially for the project.

The RRR alignment runs between Baanth Mor, Rawat, on GT Road and the Thalian Interchange. Construction of the new RRR will cut chronic car congestion in the centre of the city. The construction operation is being speeded up, so as to meet the December 2025 completion schedule.

 

 

Related Content

  • Egypt’s road programme is now restarting
    February 20, 2014
    Egypt is developing its road network – local reporting and images by Egypt correspondent Mohammed Elsayed Tantawy. Egypt is now gearing up its road construction activity, with a view to reducing congestion and improving traffic flow. The country’s main highway connecting capital Cairo with the port city of Alexandria has already seen a major widening programme, but other important routes are also now being upgraded and improved. The road development programme started in earnest some years ago but was delaye
  • Slovakian road tunnel plan
    January 18, 2023
    Slovakia’s new road tunnel is being planned.
  • The Preston Western Distributor
    September 7, 2023
    Costain, as main contractor for the Preston Western Distributor project, was involved from the earliest stages, thanks to the UK’s Early Contractor Involvement approach. The project was delivered on time and on budget to the benefit of the local environment, local businesses and the region’s workforce. David Arminas reports*
  • Topcon Positioning Systems unveils Hyper XR: High-Precision GNSS receiver redefines field accuracy
    May 19, 2025

    Global Product Launch: Topcon’s new Hyper XR GNSS receiver is changing the game in surveying, construction, and geospatial work. With full satellite access, 60° tilt compensation, and calibration-free setup, it delivers unmatched precision—even in challenging environments. Paired with the FC-6400 Windows 11 tablet, this streamlined system offers intuitive workflows and cutting-edge performance. 

    Learn how Topcon is pushing boundaries with its most advanced receiver yet.