Skip to main content

$10.1 billion South Australia road and tunnel project

Work is underway for a $10.1 billion South Australian road and tunnel project.
By MJ Woof July 14, 2025 Read time: 2 mins
The third and final stage of a new road and tunnel project will boost transport connections for Adelaide in South Australia - image courtesy of © Ymgerman| Dreamstime.com


The final stage of a key road project for Adelaide in South Australia is now going ahead. Funding for the $10.1 billion (A$15.4 billion) South Road Project in South Australia is being provided jointly by the Federal Government and South Australia Government. Three TBMs are being used for the project, with machines being supplied from both Germany and China.

The launch point for the third TBM being used for the project is located at the Central North Construction Precinct in Richmond, between Sir Donald Bradman Drive and Keswick Creek. The TBM will be assembled at this point and when ready, will drive twin 2.2km bores. The launch box for the TBMs will be supported by diaphragm walls going down to a depth of 38m. The diaphragm wall panels are being constructed one at a time.

A bentonite slurry plant has been set up at Central North, which will produce and recycle bentonite to ensure ground stability for the excavation process. When complete, the twin Northern Tunnels will connect James Congdon Drive with the motorway to the south of Grange Road. The River Torrens to Darlington Project will provide a continuous South Road connection once complete. The River Torrens to Darlington (T2D) Project is the final 10.5km section of the North-South Corridor.

The new route will provide 78km of non-stop, traffic light free motorway between Gawler and Old Noarlunga. It will allow drivers to bypass 21 sets of traffic lights between the River Torrens and Darlington as they travel between two separate tunnels, connected by an open motorway.

According to the authorities by having the cars and trucks using the route, the T2D Project will connect communities across Greater Adelaide. The commute from West Hindmarsh to Darlington will take just nine minutes, saving 30 to 40 minutes of travel time during peak hour traffic. The highway will deliver shorter journey times to key destinations including the CBD and major gateways such as Port Adelaide and Adelaide Airport as well as a crucial route for heavy vehicles and commercial freight trips.


 

Related Content

  • Rich salt harvest – Wirtgen Surface Mining in Mexico
    November 27, 2014
    Close to Guerrero Negro in the west of Mexico the world's largest salt field is located. There two Wirtgen Surface Miners 2200 SM produce enormous amounts of the "white gold" - economically and in top quality. The company Exportadora del Sal S.A. (ESSA) – a joint venture between the Mexican government and Mitsubishi Corporation – has produced salt on a large scale in the Ojo de Liebre Lagoon since 1957. With a total area of 33,000 ha, this gigantic evaporation pond is now the largest salt works of its kind
  • Volvo DD105 compactors for emerging markets
    January 7, 2021
    Features on the DD105 and DD105 OSC include Eco Mode to cut fuel consumption by 30 per cent.
  • Italian equipment market continues growth in first three-quarters 2017
    October 27, 2017
    Growth in the first three-quarters of 2017 remained high for the Italian construction manufacturing sector, according to the umbrella organisation Unacea. Over the first nine months of the year, 7,964 units of construction equipment were sold in the Italian market, up 13% compared with the same period in 2016. This consisted of 7,551 earthmoving machines, up 13% year-on-year. Positive trends were also seen in the road equipment sector, which was up 11% on a similar basis, with 318 machines sold.
  • Pūhoi-to-Warkworth opening in 2022
    August 5, 2020
    The 18.5km route near Auckland, New Zealand, was to open by the end of 2021.