Skip to main content

10,000 Belgian construction job cuts fear after tax change

Up to 10,000 Belgian construction jobs could be lost after tax deductions for roof insulations are abolished, according to Confédération Construction (CC).
March 15, 2012 Read time: 1 min
Up to 10,000 Belgian construction jobs could be lost after tax deductions for roof insulations are abolished, according to Confédération Construction (CC). Roof insulation tax deductions are this year set to fall from 40% to 30%, before being abolished completely in 2013. CC said the move will potentially cost the Belgian construction industry €1billion and 10,000 of the current 216,000 industry employees. The influential body said that it would like a more gradual removal of the roof insulation tax deduction.

Related Content

  • Faster than a speeding cow – your local bus maybe?
    May 22, 2015
    A methane-powered bus has set a speed record for a regular city bus of nearly 124km/h at a test track in the UK, according to media reports. The bus, from the southern city of Reading, was converted to run on compressed methane from cow manure and was painted black and white like a Friesian cow. Mechanics removed the bus’s engine governor that restricted the vehicle’s speed to 90km/h. The bus then broke the record on the banked high-speed circuit at Millbrook Proving Ground, near the city of Bedford.
  • Cable works starts on Gordie Howe Bridge
    February 10, 2023
    The tolled six-lane bridge over the Detroit River, between Windsor in Canada and Detroit in the US, is costing around US$4.2 billion with an opening date likely in 2025.
  • Cape Cod bridge replacements planned
    May 30, 2022
    Key Cape Cod bridge replacement projects are planned.
  • Bridge deck launched for the New Wear Crossing, Sunderland (Video)
    March 30, 2017

    The 300m bridge deck of Sunderland’s New Wear Crossing has been successfully launched across the river.

    The 4,750tonne concrete and steel deck was resting on the south side of the River Wear from where it was inched across to touch the north side in a 20-hour operation. It had to slide through the twin arched towers of the bridge’s double pylon on its way to its final position to connect the city regions of Pallion to the south and Castletown to the north.