Skip to main content

UK Roads Crash Demo Day is a Big Hit

Representatives from local authorities, the police, and the highway safety-related business world attended last month’s UK Roads Crash Demonstration Day at MIRA near Nuneaton, in central England. Guy Woodford reports It was never meant to be an occasion for crash test dummies. And each of the latest road safety solutions from leading highway technology companies tested at the UK Roads Crash Demonstration Day passed with top marks. A crowd of over 100 enjoyed the high impact, minimum damage action.
July 19, 2012 Read time: 4 mins

Representatives from local authorities, the police, and the highway safety-related business world attended last month’s UK Roads Crash Demonstration Day at MIRA near Nuneaton, in central England. Guy Woodford reports

It was never meant to be an occasion for crash test dummies. And each of the latest road safety solutions from leading highway technology companies tested at the UK Roads Crash Demonstration Day passed with top marks. A crowd of over 100 enjoyed the high impact, minimum damage action which featured:

  • A 900kg car colliding with a new 140mm diameter fibre composite traffic signal post provided by 1604 FSP Ltd, complete with 1134 Siemens signal head and electrical supply, and planted in an 5610 NAL Retention Socket.

  • A saloon car striking a Barrier Guard 800
        gate manufactured by 1529 Highway Care.

  • An NE classified shored-up sign structure from 5608 SAPA Poles being hit by a 1,500kg HGV 
         at 100kph (62mph).

  •  A 4m high passively safe SAPA Poles traffic signal pole being struck by a fast moving vehicle.

  • 4017 Delta Bloc’s DB 100 H4a vertical concrete barrier being hit by a 7.5tonne commercial vehicle at 97kph (60mph).

Speaking after the eye-catching demonstration of the SAPA Poles shored-up sign structure, with a 4.5m wide and 7.5 high sign plate, the company’s UK sales manager Simon Bates said: “It went very, very well. It was a superb demonstration. The product performed as it was designed to. The lack of indentation in the vehicle is there for all to see.”

After the demonstration of the firm’s Barrier Guard 800 gate, Highway Care (HC) managing director Steve Powell said: “Barrier gates are being used more and more on roads now. This test shows there is a barrier gate system that contains an accident with minimum [vehicle] deflection, while requiring no repair or replacement.“

Powell said the Barrier Guard 800 gate was being used on major highways all over the world. Within the last year HC has also made available a Barrier Guard 800 gate with wheels which, Powell said, is the only wheeled-gate barrier solution on the market.
In the exhibition area Valmont-Stainton (VS) UK national sales manager, Ian Huxley, and VS area sales manager Emma Berry, were highlighting the benefits of the firm’s Salus passive safety steel lighting column.

Huxley said: “Today is almost its official (UK) launch. People have been particularly interested in the fact that the product is made out of steel rather than aluminium. Events like this are important, particularly when you’re introducing new products.”

Miles Dadson, 3158 MIRA principal engineer who hosted the event said: “The HEF [High Energy Facility] team are pleased to support the UK Roads initiative - aimed at reducing the number of injuries caused by road collisions through the design and use of passively safe roadside furniture. By carrying out demonstration days such as this at MIRA’s High Energy Facility we’re able to show people first-hand the benefits of using passive safety systems on European roads.”

UK Roads managing director, Andrew Pledge, said: “The ability to watch high energy passive safety demonstrations makes MIRA a wonderful venue for road safety education, and the visual impact of crash testing adds tangibility to this important form of engineering. Next year we hope to see even more people attending this event, and it would be great to see both active and passive road safety systems on show.”

The full list of exhibiting companies at the UK Roads Crash Demonstration Day were: Mott McDonald; MIRA; SAPA Poles; FSP; 5609 King Trailers; 6250 One2see/Harvard; 3160 FLI Structures; Highway Care; 3162 Gloucester Composites; 346 Traffex/Road Expo; Brett Landscaping; NAL; 6251 Valmont Stainton; Solar Signs; Delta Bloc; 2439 SignPost Solutions; Varley & Gulliver; Post & Column; 5614 Ritherdon; 5615 Poletech; 2314 Stirling Lloyd; ALAD; 5616 TMS Consultancy; and professional institutions the Chartered Institution of Highways & Transportation (CIHT); and the Institute of Highway Engineers (IHE).

For more information on companies in this article

Related Content

  • Conference success in Australia
    February 28, 2012
    ARRB reports a successful conclusion for the 3rd International Road Surface Friction Conference on Australia's Gold Coast.
  • Presidio Parkway: the Golden Gate Bridge’s new southern approach road
    May 29, 2013
    Work on the Presidio Parkway, a new breathtaking and eco-friendly southern approach road to San Francisco’s Golden Gate Bridge, has entered its crucial second and final phase. As Guy Woodford reports, the vital US$1 billion project has overcome legal as well as environmental challenges to stay on course for its expected 2016 completion Just after 9pm on Friday April 27, 2012 a large public crowd looked on excitedly as a fleet of more than 40 R&L Brosamer and Ferma Corporation deployed hydraulic demolition h
  • Safer roads for UK?
    February 29, 2012
    A major campaign is commencing in the UK with the laudable aim of reducing road fatality rates.
  • UK Business Secretary opens Control Centre at MIRA Technology Park
    November 14, 2012
    MIRA Technology Park in central England has reached the first milestone in its aim to become Europe’s most advanced independent transport technology facility - with the successful completion of its Control Centre. The 3,998m² building, representing a US$9.52 million (£6mn) investment and opened last week by the Rt Hon Dr Vince Cable, Secretary of State for Business, Innovation and Skills, is the first new building completed since the technology park was granted Enterprise Zone status in August 2011.