Skip to main content

Tricky mountain road rebuild job in Phoenix AZ

April 26, 2021 Read time: 1 min
Rebuilding the twisting road presented challenges but the use of Viewpoint software made the process easier

Sophisticated technology played  a vital role in a difficult road construction project...

Related Content

  • Motorway's tricky cable installation
    February 6, 2012
    The UK is now benefiting from the installation of sophisticated automated traffic management equipment and information signs on its motorway network. But with heavy traffic volumes on these roads, novel techniques have had to be implemented. One such operation, organised by client The Highways Agency and its consulting engineer A.One+, has recently been underway on the M56 motorway between Junctions 9 and 16 in north-west England under the Triple Package Advanced Works designation. To minimise traffic distu
  • London road repair deal for FM Conway
    October 16, 2020
    FM Conway has won a London road repair package.
  • Sykes Pumps ballasting expertise adds weight to Forth float-outs
    June 17, 2016
    UK hire specialist, Sykes Pumps, is playing a vital role in delivering Scotland’s biggest transport infrastructure project in a generation - The Forth Replacement Crossing (FRC). Once completed later this year, the new road bridge will be the longest three-tower cable-stayed bridge in the world. Forth Crossing Bridge Constructors (FCBC) consortium is using 42,000 tonnes of steel. Getting all that steel out into the Firth of Forth is a delicate operation. The project involves transferring 7,000tonne se
  • Transforming Algeria's road network
    February 9, 2012
    Highway construction work is transforming Algeria, providing the country with a new network of highway quality road connections.