Skip to main content

Transstroy improving Russia’s aviation infrastructure

Aviation is playing an important role in developing Russia’s economy and resolving socio-economic issues. It’s particularly important for the country’s role as an international and domestic hub, ensuring the transportation of residents from remote regions
January 21, 2014 Read time: 4 mins
Transstroy-built Sheremetyevo airport control tower
Aviation is playing an important role in developing Russia’s economy and resolving socio-economic issues. It’s particularly important for the country’s role as an international and domestic hub, ensuring the transportation of residents from remote regions

In recent years Russia has carried out large-scale modernisation of its aviation capabilities, updating technical equipment, construction and development of airfields and airport infrastructure ahead of its promotion at upcoming international events such as the 2014 Sochi Olympic Games, the football World Cup in 2018, and other regional development projects. An effective national airfield and airport network will allow a high level of air transport security, continuing passenger growth and an expansion of the number of flight paths offered. Furthermore, it will increase availability of year-round flights in modern aircraft to different regions of Russia. 3382 Transstroy is among the transport infrastructure construction companies benefiting from the upgrade in Russia’s aviation sector. The firm has a proven track record on aviation-based construction projects. The firm’s projects have included the construction and reconstruction of major Russian airports and air bases, such as Sheremetyevo (Moscow), Vnukovo (Moscow), Pulkovo, Gelendzhik (Krasnodar Territory), and Blagoveshchensk airports, and Khotilovo air base. Of the four control towers, including command and control centres, constructed in Russia in the past four years, three – at Vnukovo, Sheremetyevo, and Gelendzhik airports – were built by Transstroy. The fourth control tower was built at Koltsovo (Novosibirsk) airport.

Transstroy works on solo projects in addition to projects in partnership with Russia’s Research Studies Institute of Transport Construction. The company provides a full range of activities in the field of airfield construction including the construction of runway, aircraft parking, bearing track (taxi strip), central command control centres, drainage systems, roads and industrial and civil sites.

Airfield and airport infrastructure construction projects are, says Transstroy, the hardest construction projects, as the quality of work performed by the contractor is crucial to ensuring safe flights for passengers, and a reliable and delay-free aircraft service.

Currently, Transstroy is building a new runway (Runway 3) at Sheremetyevo Airport. The plans for the project include building around 90 facilities, of which the largest runway will be 3,200m long with a width of 60m. The overhead road taxiway (Taxiway D) is the most important part of the new runway and involves an innovative construction. According to the plans, the taxiway will join Runway 3, with the existing airfield and the overhead road crossing over the Sheremetyevo functional highway. Similar structures to the Taxiway D being built at Sheremetyevo Airport have been built at some of the main international airports in Europe, including in Amsterdam and Paris.

Transstroy is providing solutions to Deal with weak soil foundations, wetlands, old riverbeds and streams at the construction site of Runway 3 at Sheremetyevo Airport. The firm has extensive experience providing solutions to similar issues at other project sites that have difficult geological and climatic conditions. An example of this is the company’s work on the construction of the Kurortny Avenue alternative route to the Sochi Mountains and the Amur- Yakutsk highway, which experiences extremely low temperatures in Yakutia.

According to the Sheremetyevo Airport project, the airfield will be classified as 4-F by the ICAO, which will allow it to accept all modern types of foreign and domestic airplanes. The planned capacity for the new runway will be 44 takeoffs/landings per hour. The integration of Runway 3 will increase the capacity of the Sheremetyevo Airport, allowing passenger service to increase to 65 million people annually by 2030.

Transstroy has also been updating the infrastructure at Krasnodar airport as part of the development of a modern and efficient transport system in South Russia. The project includes the reconstruction of Runway 2, the creation of complex engineering installations, the installation of technology providing delay-free, high-quality servicing of aircraft. The airport in Krasnodar will conform to Class II ICAO category after the completion of the works. It will be able to take the most modern airplanes, allowing Krasnodar airport to become South Russia’s largest regional transport hub.

For more information on companies in this article

Related Content

  • Junction construction
    February 7, 2012
    Two Liebherr mobile cranes and four Atlas Copco compressors are playing an important role in upgrades to a highway in Brazilian city São Paolo.
  • Russia’s Rubles for regional road revolution reduced
    April 15, 2015
    The Russian Government has set a budget of US$1.11 billion which it is allocating for a series of road construction projects in its regions. This federally funded budget for road construction in Russia’s regions in 2015 does represent an increase from the previous year’s spending. In 2014 $1.026 billion was spent on regional road projects. However, the $1.11 billion is still a reduction from the original regional road spending plan for 2015 of 13.3%. The budget has had to be cut due to Russia’s current econ
  • New coastal highway route for Reunion
    July 15, 2016
    Work on a new €1.7 billion coastal road is underway around France’s Reunion Island This new 12.3km highway (Route du Littoral) will have three lanes in each direction when it is complete in 2018. The new offshore highway connects Saint Denis, the administrative capital of La Réunion, with La Possession.
  • Lintec asphalt plants for Egypt and the Philippines
    December 1, 2023

    Egyptian firm Rsquared Construction has been using a Lintec CSD2500B asphalt plant to assist with material supply for a road project in the south of the country. The Lintec CSD2500B plant’s first task was to supply material for a short but important road link. The firm, Rsquared Construction, selected the model for its ease of transport and low fuel consumption.