Skip to main content

Stirling Lloyd launches Bond Coat 3, part of the Eliminator series

Stirling Lloyd Polychem has introduced a cold, spray-applied bond coat that it says provides enhanced adhesion values and superior in-situ performance Bond Coat 3, part of the Eliminator bridge deck waterproofing system, “represents a significant development” in the provision of tack and bond coats that are used to adhere the asphalt surfacing to the waterproofing. It provides a fast-curing tack-free, durable protective finish that resists contamination and damage from traffic. It removes the risk of
July 7, 2016 Read time: 2 mins
Applying Bond Coat 3 to Crumlin Bridge, Scotland
2314 Stirling Lloyd Polychem has introduced a cold, spray-applied bond coat that it says provides enhanced adhesion values and superior in-situ performance

Bond Coat 3, part of the Eliminator bridge deck waterproofing system, “represents a significant development” in the provision of tack and bond coats that are used to adhere the asphalt surfacing to the waterproofing.

It provides a fast-curing tack-free, durable protective finish that resists contamination and damage from traffic. It removes the risk of tyre pick-up, a common problem with conventional bitumen-based bond coats.

Bond Coat 3 is a cold reactive resin system. But unlike polymer modified bitumen bond coats, the same application equipment that applies the primer and membrane can be used to apply Bond Coat 3. This reduces plant mobilisation, costs and application times.

With an activation temperature of only 90°C, Bond Coat 3 reacts with lower temperature asphalt mixes now widely used in the industry, without compromising the strong bond it achieves with asphalt surfacing. This also includes those where the bitumen content is low or where the surfacing layer is relatively thin. Avoiding the use of hot materials, the new cold-applied bond coat also improves on-site safety.

Stirling Lloyd says that independent laboratory testing has shown that Bond Coat 3 surpasses all of the enhanced adhesion requirements specified in 8100 Highways England Interim Advice Note (IAN 96/07 R1) and 4068 Transport Scotland’s Guidance for Waterproofing (TS IA 24 9). It has also received British Board of Agrément (BBA) certification and Highways Authorities Product Approval Scheme (HAPAS) approval following on-site assessments and trials.

“The Bond Coat 3 system offers a more efficient alternative to polymer modified bitumen bond coats,” said Cliff Weston, director at Stirling Lloyd. “Bond Coat 3 provides a durable, tack-free finish, even in warm temperatures, which, for waterproofing contractors, will mean that they don’t have to return to the site for a second visit. The bond coat can be installed immediately after the membrane with less risk of damage and contamination from subsequent trades.”

Since the launch of the new product, Stirling Lloyd says that Bond Coat 3 has been used on numerous bridges, including the M8/M73/M74 interchange near Glasgow as part of Transport Scotland’s motorway improvement measures and in England on the M6 Heysham Link for Highways England.

For more information on companies in this article

Related Content

  • DenimoTech focuses on today's challenges
    November 27, 2012
    Empty environmental commitments from governments, falling bitumen quality and the impact of the economic crisis - DenimoTech asked some of its global distributors about the challenges of today’s markets - Kristina Smith was there to listen in Competition from Chinese manufacturers; highways abandoned half-built; the worst year for road building in the last 20 years. These are challenging times for DenimoTech’s distributors whose goal is to sell the firm’s bitumen emulsion and polymer modified bitumen plants
  • Safer surfaces
    February 6, 2012
    Transpo Industries has two new products: the T-28 colour-safe surface and T-78 polymer crack sealer.
  • Copy of New Midtown Tunnel open in Virginia
    January 30, 2017
    A project to construct the second Midtown Tunnel link in the US state of Virginia alongside the original connection has taken an important step forward – Mike Woof writes Commuters in the US state of Virginia will be pleased that the new Midtown Tunnel is now open to traffic, as it will help to boost capacity and cut congestion on the busy US 58 route connecting Norfolk and Portsmouth. The 1.13km tunnel link has been built to link with the interchange at Brambleton Avenue and Hampton Boulevard in Norfolk
  • New Midtown Tunnel open in Virginia
    January 30, 2017
    A project to construct the second Midtown Tunnel link in the US state of Virginia alongside the original connection has taken an important step forward – Mike Woof writes Commuters in the US state of Virginia will be pleased that the new Midtown Tunnel is now open to traffic, as it will help to boost capacity and cut congestion on the busy US 58 route connecting Norfolk and Portsmouth. The 1.13km tunnel link has been built to link with the interchange at Brambleton Avenue and Hampton Boulevard in Norfolk