Skip to main content

St Helena receiving airport upgrade

Two Liebherr machines, one LR 1200 crawler crane and one HS 895 HD duty cycle crawler crane, are currently employed in the construction of an international airport on Saint Helena. The island’s seclusion poses a particular challenge for this project Saint Helena, known as Napoleon’s last exile, is one of the oldest British colonies and is definitely one of the most remote places on earth. Located more than 2,000km from the African mainland in the South Atlantic Ocean, the British Overseas Territory Saint H
June 30, 2014 Read time: 2 mins
New crane is helping with airport construction project
Two Liebherr machines, one LR 1200 crawler crane and one HS 895 HD duty cycle crawler crane, are currently employed in the construction of an international airport on Saint Helena. The island’s seclusion poses a particular challenge for this project

Saint Helena, known as Napoleon’s last exile, is one of the oldest British colonies and is definitely one of the most remote places on earth. Located more than 2,000km from the African mainland in the South Atlantic Ocean, the British Overseas Territory Saint Helena has only been accessible by ship to date.
Starting from Cape Town, South Africa, for instance, the journey currently takes about five days. In order to improve the transport infrastructure to and from the island an international airport has been under construction since early 2012.

For this project two Liebherr cranes, belonging to the South African construction group Basil Read, were delivered to Saint Helena. The powerful LR 1200 crawler crane with a lifting capacity of 200tonnes was shipped in 33 separate sections from the port of Walvis Bay, Namibia, to Saint Helena at the beginning of 2014. Only a few weeks later an HS 895 HD duty cycle crawler crane arrived on the island.

Not only was the distance challenging, but also the permissible transport weight proved to be an aggravating factor. The HS 895 HD had to be disassembled into single parts, each weighing less than 40tonnes, in order to be loaded onto the ship. The winch, the A-frame, the rear counterweight cylinder as well as the boom back stops had to be removed from the crane. The airport is being built on Prosperous Bay Plain in the east of the island at an estimated cost of some €270 million.

This is one of the largest areas of relatively level ground on the mountainous island. After the scheduled completion of the airport in 2016 it will be sufficient for the landing of most short and medium range aircraft. This will not only boost the touristic ambitions and the economic development of the island but will also be of strategic importance for international air traffic as a stopover for airlines operating Cross-Atlantic flight routes.

Related Content

  • Major upgrade for Chicago O’Hare Airport
    August 14, 2015
    Internationally, airports are being upgraded and expanded to increase capacity and safety – Mike Woof writes. All around the world, airports are being expanded and upgraded, both to cope with massive increases in passenger numbers and also to handle larger aircraft. Runways have to be rebuilt with stronger structures and surfaces to handle greater air traffic volumes as well as increased loads from larger aeroplanes. Building airport runways, however, poses many challenges for construction crews. Paving qua
  • Diamond in the Pearl: China’s Hong Kong-Zhuhai-Macao Bridge complex
    March 8, 2018
    People in the Pearl River Delta are celebrating the Chinese New Year with the imminent opening of the Hong Kong-Zhuhai-Macao Bridge. David Arminas reviews progress. China’s Spring Festival, or Lunar New Year, is celebrated with the usual enthusiasm and spectacular fireworks. But celebrations will be particularly joyous for many people in the southern Pearl River Delta. The soon-to-be-open Hong Kong-Zhuhai-Macao Bridge (HZMB) will slash travel time between the Hong Kong Special Administrative Region, Zhuh
  • Technology and collaboration bring massive time savings
    December 2, 2021
    The link between any major city and its airport is a crucial one. In Auckland, New Zealand, State Highway 20B connects the city of 1.6 million people with the rest of the nation and the international airport, one of only two roads leading there
  • Lafarge picks up Vancouver runway deal
    January 24, 2025
    Lafarge Canada will be a subcontractor to Kiewit and in charge of asphalt paving for Vancouver International’s North Runway project.