Skip to main content

St Helena receiving airport upgrade

Two Liebherr machines, one LR 1200 crawler crane and one HS 895 HD duty cycle crawler crane, are currently employed in the construction of an international airport on Saint Helena. The island’s seclusion poses a particular challenge for this project Saint Helena, known as Napoleon’s last exile, is one of the oldest British colonies and is definitely one of the most remote places on earth. Located more than 2,000km from the African mainland in the South Atlantic Ocean, the British Overseas Territory Saint H
June 30, 2014 Read time: 2 mins
New crane is helping with airport construction project
Two Liebherr machines, one LR 1200 crawler crane and one HS 895 HD duty cycle crawler crane, are currently employed in the construction of an international airport on Saint Helena. The island’s seclusion poses a particular challenge for this project

Saint Helena, known as Napoleon’s last exile, is one of the oldest British colonies and is definitely one of the most remote places on earth. Located more than 2,000km from the African mainland in the South Atlantic Ocean, the British Overseas Territory Saint Helena has only been accessible by ship to date.
Starting from Cape Town, South Africa, for instance, the journey currently takes about five days. In order to improve the transport infrastructure to and from the island an international airport has been under construction since early 2012.

For this project two Liebherr cranes, belonging to the South African construction group Basil Read, were delivered to Saint Helena. The powerful LR 1200 crawler crane with a lifting capacity of 200tonnes was shipped in 33 separate sections from the port of Walvis Bay, Namibia, to Saint Helena at the beginning of 2014. Only a few weeks later an HS 895 HD duty cycle crawler crane arrived on the island.

Not only was the distance challenging, but also the permissible transport weight proved to be an aggravating factor. The HS 895 HD had to be disassembled into single parts, each weighing less than 40tonnes, in order to be loaded onto the ship. The winch, the A-frame, the rear counterweight cylinder as well as the boom back stops had to be removed from the crane. The airport is being built on Prosperous Bay Plain in the east of the island at an estimated cost of some €270 million.

This is one of the largest areas of relatively level ground on the mountainous island. After the scheduled completion of the airport in 2016 it will be sufficient for the landing of most short and medium range aircraft. This will not only boost the touristic ambitions and the economic development of the island but will also be of strategic importance for international air traffic as a stopover for airlines operating Cross-Atlantic flight routes.

Related Content

  • Sennebogen launches new 655 HD heavy-duty cycle crawler crane
    February 15, 2013
    Sennebogen’s new 655 HD heavy-duty cycle crawler crane is one of several innovations on the company’s stand at Bauma. Designed for heavy-duty tasks on construction sites and in the extractive industry, the 655 D can be used with a dragline bucket or in foundation construction. The 55tonne capacity machine can be used with a 3.5m3 Hendrix dragline bucket, for instance, and it uses two 16tonne winches driven by high-pressure regulated variable displacement hydraulic motors. There is a continuously-variable fr
  • Australia’s new airport in Queensland
    August 18, 2015
    The first new airport constructed in Australia for 45 years is now open for business. The Brisbane West Wellcamp Airport in Queensland is located 17km to the west of Toowomba. The facility was completed at the end of last year by Wagners, an Australian family-owned construction company. Toowoomba lies in the Darling Downs region of Queensland, located 126km west of Queensland’s capital city, Brisbane. Toowoomba’s population of approximately 165,000 makes it Australia’s second-most populous inland city. T
  • Praise for high production crawler crane
    April 16, 2012
    Sennebogen's 6130 HD duty cycle crawler crane has received praise for its mining work in central Germany. The machine, which comes with drag shovel and a 5.6m³ dragline, has been extracting 2,500m³ of gravel/day. The crawler crane's 29.9m boom is used to pour material over a large heap before it is sieved after a short drying period and transported on with a HGV. The Sennebogen 6130 is being used by construction company Himmel und Papesch on behalf of K+B Kies und Beton. Himmel und Papesch says the machine
  • We can be Heroes
    January 11, 2023
    Paraguay’s Puente Héroes del Chaco will provide a vital transport link for the country once it is complete, Mauro Nogarin and Mike Woof report