Skip to main content

Special formwork for Moscow

Unusual staircase columns for pedestrian crossings outside Moscow required custom-made forms Every day the largest city in the largest country in the world is threatened with gridlock. The infrastructure of the present-day traffic system can no longer cope with the increased number of vehicles, and the urban administration of Moscow, Russia, resolved to upgrade the traffic arteries connecting the inner city to satellite towns. Greater Moscow (Oblast) has a population of over seven million, and to date
June 15, 2012 Read time: 3 mins
Paschal produced a total of four form sets, each with two forms, 2m and 3m high, respectivelyPaschal produced a total of four form sets, each with two forms, 2m and 3m high, respectively
Unusual staircase columns for pedestrian crossings outside Moscow required custom-made forms

Every day the largest city in the largest country in the world is threatened with gridlock.

The infrastructure of the present-day traffic system can no longer cope with the increased number of vehicles, and the urban administration of Moscow, Russia, resolved to upgrade the traffic arteries connecting the inner city to satellite towns.

Greater Moscow (Oblast) has a population of over seven million, and to date traffic travelling to the city of Ljuberzy, 2km south-east of the Moscow roundabout, has been reached by means of an urban motorway.

Local and district streets run parallel to this route, and the second largest connecting road, an extension of the Komsomolsky Prospekt, is now being expanded. Traffic will now be routed over a newly constructed bridge, 1.737km long, where both of the lanes will be structurally separated from each other.

Construction is being carried out by LLC TransKapStroy (Moscow).

A distinctive feature of the architecture is found in additional connections for the stairways for the pedestrian crossings. There are two for each lane, which reach from the bridge to the ground in three stages.

However, the form of the stairway columns is so sophisticated that standard solutions were out of the question. The columns are manufactured locally by filling a prefabricated form with concrete, and they take the form of a symmetrical hexagon. (The cross-section is similar to the silhouette of a clam.) All 36 props have a height of 2–6.5m.

The Paschal representative office in Moscow assigned to the main factory in Steinach, Germany, a contract for the construction of a special form designed to be used repeatedly, which can sustain a pressure from fresh concrete of 80kN/m².

It created a total of four identical sets, each consisting of two extendable concrete forms, 805mm wide, 1,020mm deep and with heights of 2m and 3m respectively.

Each form consists of two parts with the required tight-fitting sharp-edged joints secured with locking screws.

According to Paschal, a feature of the design is the simplicity and efficiency brought to the construction site: “Situate the form, pour the concrete and it is done.”

“Tie openings or involved propping or any other preparation or post-processing were not necessary. In comparison with carpentry methods this means a large increase in the speed of completion in addition to millimetre precision when working with concrete,” said Paschal.

“The technical concept developed by Paschal convinced the contractor, as did the short production time of four weeks for all.

“The scope of delivery also covers props as well as a specially constructed working platform which fulfils the most rigorous safety criteria.”

The bridge has now been opened for traffic.

Related Content

  • Driver feedback signs cut speeding
    March 2, 2012
    Technology from 3M is helping reduce the incidence of speeding in the UK city of Salford. A series of Driver Feedback Signs from 3M, DFS 700 units, have been installed in the area to gather both information on average vehicle speeds and encourage drivers to observe the speed limits. The Urban Vision partnership between Salford City Council and Capita Symonds manages the local highways on behalf of the council and has installed 50 of the DFS 700 units in strategic locations close to schools, the entrances to
  • Nigeria’s giant city Lagos to benefit from a new cable-stayed bridge
    September 19, 2012
    The first cable-stayed bridge in Nigeria will link two districts of the megacity of Lagos Nigeria’s first cable-stayed bridge, the Lekki Ikoyi Bridge in the megacity of Lagos is scheduled for completion at the end of 2012. Its striking 90m high pylon characterises the appearance of the 1,357m long bridge, which will connect two districts of the West African city, Lekki on the Lekki Peninsula and Ikoyi on Lagos Island.
  • The concrete option
    July 31, 2012
    Concrete highway construction techniques and technology continues to evolve. Mike Woof reports The recent increases in oil costs are having a knock-on effect for the road construction sector, as asphalt prices have increased noticeably and faster than those for concrete. This has spurred renewed discussion over which construction technique now offers the best long term solution for road building. The debate between those in favour of concrete and those preferring asphalt for highway construction has been on
  • Korean bridge construction poses challenges
    February 23, 2012
    On South Korea's southern coast, an innovative highway sea crossing is providing many engineering challenges