Special formwork for Moscow

Unusual staircase columns for pedestrian crossings outside Moscow required custom-made forms Every day the largest city in the largest country in the world is threatened with gridlock. The infrastructure of the present-day traffic system can no longer cope with the increased number of vehicles, and the urban administration of Moscow, Russia, resolved to upgrade the traffic arteries connecting the inner city to satellite towns. Greater Moscow (Oblast) has a population of over seven million, and to date
June 15, 2012 Read time: 3 mins
Paschal produced a total of four form sets, each with two forms, 2m and 3m high, respectivelyPaschal produced a total of four form sets, each with two forms, 2m and 3m high, respectively
Unusual staircase columns for pedestrian crossings outside Moscow required custom-made forms

Every day the largest city in the largest country in the world is threatened with gridlock.

The infrastructure of the present-day traffic system can no longer cope with the increased number of vehicles, and the urban administration of Moscow, Russia, resolved to upgrade the traffic arteries connecting the inner city to satellite towns.

Greater Moscow (Oblast) has a population of over seven million, and to date traffic travelling to the city of Ljuberzy, 2km south-east of the Moscow roundabout, has been reached by means of an urban motorway.

Local and district streets run parallel to this route, and the second largest connecting road, an extension of the Komsomolsky Prospekt, is now being expanded. Traffic will now be routed over a newly constructed bridge, 1.737km long, where both of the lanes will be structurally separated from each other.

Construction is being carried out by LLC TransKapStroy (Moscow).

A distinctive feature of the architecture is found in additional connections for the stairways for the pedestrian crossings. There are two for each lane, which reach from the bridge to the ground in three stages.

However, the form of the stairway columns is so sophisticated that standard solutions were out of the question. The columns are manufactured locally by filling a prefabricated form with concrete, and they take the form of a symmetrical hexagon. (The cross-section is similar to the silhouette of a clam.) All 36 props have a height of 2–6.5m.

The Paschal representative office in Moscow assigned to the main factory in Steinach, Germany, a contract for the construction of a special form designed to be used repeatedly, which can sustain a pressure from fresh concrete of 80kN/m².

It created a total of four identical sets, each consisting of two extendable concrete forms, 805mm wide, 1,020mm deep and with heights of 2m and 3m respectively.

Each form consists of two parts with the required tight-fitting sharp-edged joints secured with locking screws.

According to Paschal, a feature of the design is the simplicity and efficiency brought to the construction site: “Situate the form, pour the concrete and it is done.”

“Tie openings or involved propping or any other preparation or post-processing were not necessary. In comparison with carpentry methods this means a large increase in the speed of completion in addition to millimetre precision when working with concrete,” said Paschal.

“The technical concept developed by Paschal convinced the contractor, as did the short production time of four weeks for all.

“The scope of delivery also covers props as well as a specially constructed working platform which fulfils the most rigorous safety criteria.”

The bridge has now been opened for traffic.

Related Content

  • PERI fills gap in Greek market
    February 19, 2013
    A team of Greek and German PERI engineers have developed a comprehensive formwork and scaffolding solution for the T4 bridge on the A7 motorway in Greece. The 160km long A7 connects Kalamata in the south to Corinth in the northwest of the Peloponnese peninsula. On one stretch of the motorway a 390m long arched bridge – known as T4 – is being used to close the gap between Paradisia and Tsakona. Set for completion in early 2014, two-thirds of the 22m wide bridge superstructure will be suspended on a steel arc
  • Approval for Moscow’s ring road reconstruction
    October 15, 2015
    Moscow’s ring road is due for rebuilding – Eugene Gerden writes. The Moscow city authorities have finalised the project of the reconstruction of the Moscow Ring Road. The ring road encircles the City of Moscow and the plan was announced by Marat Khusnullin, deputy mayor of the city. Khusnullin said that, to date, the Moscow city government has completed 90% of the design documentation of the project.
  • Giving four hours back to the day… and much more
    October 7, 2019
    A 20km long elevated expressway in Dhaka will be one of Bangladesh’s first Public Private Partnership transport projects – words and pictures by Ruby Kitching, on behalf of Mott MacDonald.
  • Key expressway route through Hunter Valley
    November 11, 2013
    Australia’s Hunter Valley will benefit from a new high speed expressway, which is currently under construction - Simon Gould reports Located two hours north of Sydney, the Hunter Valley region in New South Wales is one of Australia’s largest producers of coal and wine. With international demand, particularly from Asia, for both continuing to increase, a significant upgrade of infrastructure was required between the region and the port of Newcastle, the world’s largest coal export port. However the strict en