Skip to main content

South Africa's world class tollway development

Part of an extensive motorway network measuring some 185km, the ongoing Gauteng Freeway Improvement Project (GIFP) is creating a modern, world-class toll route system that provides major impetus to socio-economic growth in South Africa's most populous and commercially active region.
May 8, 2012 Read time: 2 mins
Part of an extensive motorway network measuring some 185km, the ongoing Gauteng Freeway Improvement Project (GIFP) is creating a modern, world-class toll route system that provides major impetus to socio-economic growth in South Africa's most populous and commercially active region.

Being implemented in stages by the 3156 South African National Road Agency (SANRAL), these routes radiate outwards from the country's largest city Johannesburg to Pretoria's industrial and residential centres and to all points of the compass.

Already on major N1 and N3 transportation upgrades within Gauteng, previous congestion has now been replaced by free-flowing traffic that is foremost driven by business priorities that are time dependant. So too are the ensuing construction works.

National Route 12 (N12) is one of SANRAL's strategic priorities and it is here that civil engineering contractor 3038 Raubex Construction is  implementing a ACTFILE LOCATION:

• South Africa
PROJECT:
• National Route 12 (N12)
CONTRACTOR:
• Raubex Construction
EQUIPMENT:
178 Caterpillar RM500 rotary mixer
complete  overhaul on Section 19, an intensive programme running over 30 months.

Three major new interchanges, successive bridge widenings and an east and westbound three-lane highway in either direction will replace the existing N12 dual carriageway system along approximately 10km between the current Tom Jones and Daveyton on- and off-ramps.

The median reserve will be replaced by a central concrete median barrier to make room for the new lanes, which is where the roadworks begin, progressively moving from the inside out to complete the new freeway system.

This is the main access point passing into and out of Gauteng's West Rand region to the agricultural and mining heartland of Mpumalanga province.

Managing high traffic densities together with major road realignments will be just one of a number of challenges that need to be carefully managed. The N12 design calls for an emulsion and cement stabilisation mix for the sub-base layers.

"The N12 contract follows a similar pattern to the SANRAL project we completed in May 2010 for Section 1 of the R21 upgrade, which links OR Tambo International Airport with Pretoria [South Africa's capital]," explains Raubex Construction operations manager, Wouter van der Merwe.

For more information on companies in this article

Related Content

  • G&Z pave the way as East meets West
    March 28, 2014
    The Silk Route is one of the oldest trading links between Europe and Asia and is being upgraded with some of the newest equipment. The nation of Georgia is located on what is known as the ‘crossroads’ between Western Asia and Eastern Europe. It lies to the east of the Black Sea and is on one of the shortest routes between western China and Europe. Since the Middle Ages this strategically important country has played host to one of the network of roads collectively known as the Silk Route. For much of the 20
  • Indian highways road construction
    April 16, 2012
    Superlatives, once applied only to China's phenomenal growth, are now being used for India. Patrick Smith reports Those involved with the Naini Bridge in Allahabad are so proud of the result that they have set up an exhibition centre detailing its construction.
  • Israel's new tunnel project
    April 20, 2012
    The Israel National Roads Company is opening the tender process for the project to drive new tunnels on Road no 1.
  • Innovative, flexible bridge formwork systems
    February 14, 2012
    Innovative formwork systems have been used to construct a variety of bridge structures. Patrick Smith reports. As part of the work on Germany's new A4 autobahn near Eisenach, the contracting joint venture awarded the formwork contract for two of the three viaducts to Doka. What makes this assignment so special to the company is that although the two steel composite bridges each have very different cross-sections, the JV is using the same overslung composite forming carriage to pour the carriageway slabs of