Skip to main content

South Africa's world class tollway development

Part of an extensive motorway network measuring some 185km, the ongoing Gauteng Freeway Improvement Project (GIFP) is creating a modern, world-class toll route system that provides major impetus to socio-economic growth in South Africa's most populous and commercially active region.
May 8, 2012 Read time: 2 mins
Part of an extensive motorway network measuring some 185km, the ongoing Gauteng Freeway Improvement Project (GIFP) is creating a modern, world-class toll route system that provides major impetus to socio-economic growth in South Africa's most populous and commercially active region.

Being implemented in stages by the 3156 South African National Road Agency (SANRAL), these routes radiate outwards from the country's largest city Johannesburg to Pretoria's industrial and residential centres and to all points of the compass.

Already on major N1 and N3 transportation upgrades within Gauteng, previous congestion has now been replaced by free-flowing traffic that is foremost driven by business priorities that are time dependant. So too are the ensuing construction works.

National Route 12 (N12) is one of SANRAL's strategic priorities and it is here that civil engineering contractor 3038 Raubex Construction is  implementing a ACTFILE LOCATION:

• South Africa
PROJECT:
• National Route 12 (N12)
CONTRACTOR:
• Raubex Construction
EQUIPMENT:
178 Caterpillar RM500 rotary mixer
complete  overhaul on Section 19, an intensive programme running over 30 months.

Three major new interchanges, successive bridge widenings and an east and westbound three-lane highway in either direction will replace the existing N12 dual carriageway system along approximately 10km between the current Tom Jones and Daveyton on- and off-ramps.

The median reserve will be replaced by a central concrete median barrier to make room for the new lanes, which is where the roadworks begin, progressively moving from the inside out to complete the new freeway system.

This is the main access point passing into and out of Gauteng's West Rand region to the agricultural and mining heartland of Mpumalanga province.

Managing high traffic densities together with major road realignments will be just one of a number of challenges that need to be carefully managed. The N12 design calls for an emulsion and cement stabilisation mix for the sub-base layers.

"The N12 contract follows a similar pattern to the SANRAL project we completed in May 2010 for Section 1 of the R21 upgrade, which links OR Tambo International Airport with Pretoria [South Africa's capital]," explains Raubex Construction operations manager, Wouter van der Merwe.

For more information on companies in this article

Related Content

  • Innovative new drainage solutions will help keep roads free from water
    October 2, 2014
    An array of new technologies will help optimise road drainage and minimise flooding risks - Mike Woof reports In the UK the specialist contractor Lanes Group has carried out extensive inspection work of the drainage systems for the M6 toll route around the city of Birmingham. A powerful zoom camera has been used to carry out the inspection work for Midland Expressway, which operates and maintains the 43km-long motorway, running from Coleshill to Cannock.
  • Indra chooses Citilog for Silvertown Tunnel
    June 28, 2024
    Citilog will integrate its automatic incident detection (AID) system to help reduce congestion in and around the tunnel between the London borough of Greenwich, the peninsula area, and West Silvertown.
  • Nigerian bridge deal awarded
    January 17, 2023
    A major Nigerian bridge deal has been awarded.
  • Bertha ends her Alaskan Way voyage in Seattle
    December 21, 2017
    Seattle's State Route 99 viaduct is coming down. David Arminas was on site. Bertha, the world’s largest diameter earth pressure balance tunnel boring machine, with a cutterhead diameter of 17.5m, is no more. Her 2.7km journey underneath the waterfront area of Seattle finished on April 4 and the power went off for the last time on an extraordinary TBM that had finally completed an extraordinary job. “A small sidewalk job would have had more impact on city traffic than we have had,” says Brian Russell a v