Skip to main content

The Road to recovery: bolstering Europe’s infrastructure

By Duncan McCormick December 9, 2020 Read time: 1 min
Sophisticated software tools offers better design, planning and operations for construction works

The use of innovative technology could optimise infrastructure construction operations…

For more information on companies in this article

Related Content

  • LiuGong offering new emission compliant excavators
    February 16, 2016
    LiuGong is introducing new Tier 4 Final/Stage IV compliant versions of its 925E and 933E excavators during 2016. These are being built in its factory in Poland and benefit from patented turbocharging technology developed by Cummins, optimising power and minimising fuel consumption. This system is said to vary varies airflow to match engine and load demand. The low speed, high output torque engines are specially designed for the E-series excavators, while the machines also feature innovative negative flow hy
  • LiuGong offering new emission compliant excavators
    January 6, 2017
    LiuGong is introducing new Tier 4 Final/Stage IV compliant versions of its 925E and 933E excavators during 2016. These are being built in its factory in Poland and benefit from patented turbocharging technology developed by Cummins, optimising power and minimising fuel consumption. This system is said to vary varies airflow to match engine and load demand. The low speed, high output torque engines are specially designed for the E-series excavators, while the machines also feature innovative negative flow hy
  • Bentley Systems construction awards announced
    October 22, 2020
    Bentley Systems has announced the winners for its construction awards.
  • Funding for Estonia infrastructure
    June 7, 2016
    European funding will pay for the reconstruction of key infrastructure links in Estonia. During 2015, the country started work on 421 projects being funded by the EU. The total value of these 421 projects was €1.082 billion. Some €108.6 million of this EU funding was used for road construction, with €45.7 million being used to rebuild the Väo-Jüri section of Talinn’s ring road.