Skip to main content

Revealed: Professionals reveal how they are benefiting from building information modelling

One of the most important developments in the world of ‘PropTech’ over the last few years has been that of building information modelling (BIM). The technology essentially facilitates architecture, engineering and construction (AEC) professionals to create and use an intelligent 3D model to gain valuable insight into how a building project can be better planned, designed and managed. Interested in ground-breaking ‘PropTech’, housing agents Sellhousefast.uk surveyed 602 architects, engineers and cons
August 9, 2019 Read time: 4 mins
One of the most important developments in the world of ‘PropTech’ over the last few years has been that of building information modelling (BIM).


The technology essentially facilitates architecture, engineering and construction (AEC) professionals to create and use an intelligent 3D model to gain valuable insight into how a building project can be better planned, designed and managed.

Interested in ground-breaking ‘PropTech’, housing agents Sellhousefast.uk surveyed 602 architects, engineers and construction professionals to identify what they think are the biggest benefits of using building information modelling (BIM).

Sellhousefast found that professionals view reduced rework through better coordination and clash detection (76%) as the biggest advantage of harnessing BIM. From BIM - internal and external stakeholders can access a shared model to see where possible clashes may occur (e.g. pipework running through steel beam etc.) and then, coordinate between them to rectify the issue before construction even begins.  

Thereafter, 72% feel the enhanced visualisation from BIM enables them to positively elevate the planning and design process. Understandably so, as the 3D modelling element of BIM can provide a detailed real-world imaging of entire floor plans prior to starting building work.

In third position, 68% of the experts believe BIM decreases errors/information loss/duplicate data entry. Whilst, 66% think the tech has a good impact financially, as it improves cost estimations and budget control.

Since BIM allows for documentation to be easily changed by all parties involved in a project to account for any new information/changes (e.g. site conditions etc.) – scheduling/sequencing activities can therefore be communicated and planned more accurately. In doing so, lead to shorter project cycles according to 54% of professionals.     

Interestingly, 47% appreciate the capabilities of BIM to recognise hazards in the pre-construction phase, thus when the time comes - minimising the occurrence of health and safety risks on the actual building site itself.

• Professionals view reduced rework through improved coordination and clash detection (76%) as the biggest advantage of harnessing building information modelling (BIM)

• Thereafter, 72% feel the enhanced visualisation from BIM enables them to positively elevate the planning and design process

• 47% appreciate the capabilities of BIM to recognise hazards in the pre-construction phase – thus, minimising health and safety risks

• Experts place insufficient BIM training/knowledge (68%) and lack of in-house BIM expertise (63%) as the primary barriers preventing the wider use of the technology

• Interestingly, 56% think the cost of BIM is a major obstacle stopping more organisations from implementing the technology in their operations/working practises

Opposingly, only 22% believe BIM gives them greater control to find which aspects of the project can be more environmentally friendly (e.g. use less energy and carbon etc.). Slightly above, 35% of professionals state the use of BIM has given them a key competitive advantage to attract new clients as well as retain existing clients.   


Additionally, Sellhousefast.uk asked the 602 professionals surveyed what they thought were the main barriers preventing the wider use of building information modelling (BIM).

From this, Sellhousefast discovered that professionals place workers having a lack of BIM training/knowledge (68%) as the primary reason as to why the technology is not being used far more than it currently is.

Subsequently, 63% attribute the little use or absence of BIM in certain organisations because they don’t have enough in-house expertise to provide adequate assistance and guidance on the functionality of BIM.

Contrastingly, just 39% blame the unprogressive culture of some companies as the principle factor stopping them from adopting cutting-edge technology such as BIM. Fascinatingly, 47% feel the projects many organisations/professionals take-on and handle are too small for them to justify the inclusion of BIM in their working practises/operations.    

Robby Du Toit, the Managing Director of Sellhousefast.uk commented:  

“Building information modelling is rapidly becoming more and more prominent. The technology is letting organisations construct buildings virtually before they are physically completed. As a result, BIM unlocks the opportunity to seek out more efficient approaches towards the planning, designing and construction phase of different projects. This research certainly shows that BIM has left an encouraging impression on professionals who have used the technology. The benefits highlighted by them, demonstrates the huge potential BIM has and as understanding of the technology improves, it will continue to revolutionise the property industry”.

Credit: %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 link-external https://www.sellhousefast.uk/ false https://www.sellhousefast.uk/ false false%>

Related Content

  • Lessons in asset management from the US
    August 14, 2014
    Jason Bittner discusses effective strategies for implementing efficient asset management practices The Moving Ahead for Progress in the 21st Century Act (MAP-21) established a performance-based highway programme aimed at improving how Federal transportation funds are allocated. The MAP-21 programme requires state departments of transport (DOT) to develop risk-based transportation asset management plans (TAMP) for roads and bridges. This move has also refocused attention on the need for asset management in t
  • Catsurveys introduces mobile GPR that covers 50km a day
    March 10, 2015
    Catsurveys Group’s latest mobile ground penetrating radar (GPR) unit can cover up to 50km a day to identify underground utilities, buried manholes, chambers, culverts, tunnels and other objects. The mobile GPR uses a multitude of low- and intermediatefrequency antennas to boost the quality of data. Double polarised antennas cover longitudinal and transverse scans to create clear images. The surveys combine GPS and total station theodolite recording to give pinpoint geolocations of all features of interest.
  • IRF publishes ITS manifesto
    February 22, 2013
    Ministerial launch marks IRF’s long-term commitment to ITS deployment and the creation of conducive policy environments for the adoption of smart technology While sustainable mobility is recognised as one of the keys to social and economic development, our roads are becoming increasingly congested, road transport has negative environmental impacts and more and more cars need to be accommodated. For IRF, a pivotal response to this dilemma lies in the increased deployment of intelligent transport systems (IT
  • Trimble’s innovation with new technology
    January 11, 2019
    Trimble is developing highly advanced technologies for the construction and quarrying sectors – Mike Woof writes Trimble is working on a number of highly innovative technologies that could revolutionise the construction and aggregates production sectors. Perhaps the most eye-catching of all of these innovations is for the autonomous compactor and dozer system Trimble is in the process of developing at present. Scott Crozier is general manager of Trimble’s general construction division. He said that whi