Skip to main content

Revealed: Professionals reveal how they are benefiting from building information modelling

One of the most important developments in the world of ‘PropTech’ over the last few years has been that of building information modelling (BIM). The technology essentially facilitates architecture, engineering and construction (AEC) professionals to create and use an intelligent 3D model to gain valuable insight into how a building project can be better planned, designed and managed. Interested in ground-breaking ‘PropTech’, housing agents Sellhousefast.uk surveyed 602 architects, engineers and cons
August 9, 2019 Read time: 4 mins
One of the most important developments in the world of ‘PropTech’ over the last few years has been that of building information modelling (BIM).


The technology essentially facilitates architecture, engineering and construction (AEC) professionals to create and use an intelligent 3D model to gain valuable insight into how a building project can be better planned, designed and managed.

Interested in ground-breaking ‘PropTech’, housing agents Sellhousefast.uk surveyed 602 architects, engineers and construction professionals to identify what they think are the biggest benefits of using building information modelling (BIM).

Sellhousefast found that professionals view reduced rework through better coordination and clash detection (76%) as the biggest advantage of harnessing BIM. From BIM - internal and external stakeholders can access a shared model to see where possible clashes may occur (e.g. pipework running through steel beam etc.) and then, coordinate between them to rectify the issue before construction even begins.  

Thereafter, 72% feel the enhanced visualisation from BIM enables them to positively elevate the planning and design process. Understandably so, as the 3D modelling element of BIM can provide a detailed real-world imaging of entire floor plans prior to starting building work.

In third position, 68% of the experts believe BIM decreases errors/information loss/duplicate data entry. Whilst, 66% think the tech has a good impact financially, as it improves cost estimations and budget control.

Since BIM allows for documentation to be easily changed by all parties involved in a project to account for any new information/changes (e.g. site conditions etc.) – scheduling/sequencing activities can therefore be communicated and planned more accurately. In doing so, lead to shorter project cycles according to 54% of professionals.     

Interestingly, 47% appreciate the capabilities of BIM to recognise hazards in the pre-construction phase, thus when the time comes - minimising the occurrence of health and safety risks on the actual building site itself.

• Professionals view reduced rework through improved coordination and clash detection (76%) as the biggest advantage of harnessing building information modelling (BIM)

• Thereafter, 72% feel the enhanced visualisation from BIM enables them to positively elevate the planning and design process

• 47% appreciate the capabilities of BIM to recognise hazards in the pre-construction phase – thus, minimising health and safety risks

• Experts place insufficient BIM training/knowledge (68%) and lack of in-house BIM expertise (63%) as the primary barriers preventing the wider use of the technology

• Interestingly, 56% think the cost of BIM is a major obstacle stopping more organisations from implementing the technology in their operations/working practises

Opposingly, only 22% believe BIM gives them greater control to find which aspects of the project can be more environmentally friendly (e.g. use less energy and carbon etc.). Slightly above, 35% of professionals state the use of BIM has given them a key competitive advantage to attract new clients as well as retain existing clients.   


Additionally, Sellhousefast.uk asked the 602 professionals surveyed what they thought were the main barriers preventing the wider use of building information modelling (BIM).

From this, Sellhousefast discovered that professionals place workers having a lack of BIM training/knowledge (68%) as the primary reason as to why the technology is not being used far more than it currently is.

Subsequently, 63% attribute the little use or absence of BIM in certain organisations because they don’t have enough in-house expertise to provide adequate assistance and guidance on the functionality of BIM.

Contrastingly, just 39% blame the unprogressive culture of some companies as the principle factor stopping them from adopting cutting-edge technology such as BIM. Fascinatingly, 47% feel the projects many organisations/professionals take-on and handle are too small for them to justify the inclusion of BIM in their working practises/operations.    

Robby Du Toit, the Managing Director of Sellhousefast.uk commented:  

“Building information modelling is rapidly becoming more and more prominent. The technology is letting organisations construct buildings virtually before they are physically completed. As a result, BIM unlocks the opportunity to seek out more efficient approaches towards the planning, designing and construction phase of different projects. This research certainly shows that BIM has left an encouraging impression on professionals who have used the technology. The benefits highlighted by them, demonstrates the huge potential BIM has and as understanding of the technology improves, it will continue to revolutionise the property industry”.

Credit: %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 link-external https://www.sellhousefast.uk/ false https://www.sellhousefast.uk/ false false%>

Related Content

  • Warm mix asphalt offers green solution
    September 4, 2019
    A new report from the UK highlights that utilising warm mix asphalt (WMA) can help cut CO2 emissions. The All-Party Parliamentary Group on Highways has issued a report highlighting how the use of WMA can reduce carbon emissions and improve efficiencies on highways projects. WMAs are manufactured and laid at lower temperatures than traditional asphalts, using less energy and delivering carbon savings without compromising performance. Their use can reduce CO2 emissions associated with asphalt production for
  • Reality check: Topcon’s Aptix
    July 20, 2023
    The biggest challenge facing construction professionals and general contractors is disconnected data and/or siloed data sources. The recently launched Aptix integration platform has broken down these silos, explains Topcon’s Scott Langbein.
  • Time, money and the environment – reducing the costs of a road project
    April 23, 2013
    Road construction has evolved considerably in recent years and today more options are available, offering greater longevity and durability, lowered costs, faster application and reduced impact on the environment. The fact that more options are available, however, means that more critical decisions must be made in order to ensure that the optimal solution is selected for the specific needs of each project. In this article we will look at some of the variables that should be considered, while examining the va
  • Movin’On by Michelin sets the stage for the Mobility of the Future
    September 4, 2019
    IRF (Geneva) was pleased to partner and lead some of the sessions of the 2019 edition of the Movin’On Summit, the world summit on sustainable mobility. The successful third edition hosted about 5,000 visionaries from 44 countries between June 4th and 6th, 2019, in Montreal, Canada and discussed new and actionable solutions to move from ambition to action. Created and inspired by Michelin, the event was produced by the Movin’On Sustainable Mobility Fund, with C2 International as the organising partner. U