Skip to main content

Repaving an F1 racing circuit

The refurbishment of the Shanghai International Formula 1 was completed recently with great success. As an important milestone in the construction of racing facilities and modern high-grade roads in China, the project has attracted attention both inside and outside the industry.
By MJ Woof January 20, 2025 Read time: 2 mins
The use of Dynapac material feeders has helped deliver a more consistent paving quality

The Shanghai F1 circuit consists of the main track, buffer zone, short connecting track and working car lanes. The main track is 5,450m long and 14-15m-wide, with 16 corners and nine straights of varying lengths. This was the first refurbishment project since Shanghai F1 was first built in 2004.

Machines from Dynapac were used for all the paving and compaction works on the track. The 20 strong fleet included SD Pavers, CC4200/6200 double drum vibratory rollers, CC1200 small tandem rollers and also three mobile feeders.

The use of high-precision equipment and modern construction solutions have delivered optimum results for the track's base, middle and surface layers, which meet stringent international track's pavement standards after careful testing by a team of experts from Germany's HART CONSULTANT, the internationally renowned construction supervisory organisation for F1. 

At the beginning of the project, Annie Bo, managing director of Dynapac China, said: “We are very honoured to be able to participate in the Shanghai International Circuit project again. This is not only a recognition of Dynapac's products and technology, but also an affirmation of our 20 years of intensive work in the Chinese market. Dynapac will do its best to provide the best equipment and services to ensure the project is completed on time and with quality.”

Dynapac also set up an international service support team, which was stationed at the jobsite to support for the contractor, Shanghai Highway and Bridge (Group). The Dynapac team worked with Shanghai Road & Bridge to ensure that the equipment delivered maximum quality and performance for the operation.
The refurbishment of the Shanghai International F1 began at the end of July 2024 and was completed on 4th September, almost a week ahead of schedule. After the completion of the project, F1 will have a new look and upgraded performance for international races in the future. 

The application of Dynapac paving and compaction equipment has played a crucial role in improving the work efficiency of the whole project. The use of the latest techniques and the new equipment have played important roles,  delivering a quality circuit for Shanghai F1 in the global racing world. 

 

For more information on companies in this article

Related Content

  • Efficient construction leads to quality roads
    November 30, 2012
    Technology to assist the installation of quick laying, yet top-quality, road surfaces requiring less frequent repair, thus limiting costs and the number of construction sites, is being sought by highways authorities the world over. The European Union devised project ASPHALT (Advanced Galileo Navigation System for Asphalt Fleet Machines) for satellite navigation and fleet management may have found just what such authorities are looking for. Within the scope of the ASPHALT research project MOBA, together wit
  • Intelligence built in to Dynapac machines
    January 16, 2017
    The highly sophisticated Fleetlink telematics system developed is now being offered across the road machine range. The system allows users to optimise fleet usage and reduce maintenance costs, boosting overall efficiency and fleet management and increasing uptime and productivity.
  • Wirtgen’s 3800 CR rips it up in San Jose
    May 16, 2017
    In California, in-situ cold recycling with a Wirtgen 3800 CR recycler has proved to be the most economical solution. In the US’s Golden State – California – Wirtgen’s 708kW powerhouse the 3800 CR recycler resurfaced 160km of San José’s main traffic arteries in situ, on-the-spot. The 3800 CR worked with a Vögele VISION 5200-2i tracked paver in a rear-load process. With this method, the 3800 CR travels in reverse, removing the damaged asphalt layers in a down-cut process and transferring the recycled material
  • Hot-to-hot paving upgrades Bremen City Airport runway
    September 30, 2013
    A new high quality runway surface has been laid at Bremen City Airport. This has provided a much-needed replacement at the airport as the old runway was laid over 20 years ago and was suffering from cracking and potholes. Laying the new surface required the airport to be closed, with the work having to be carried out in a tight time schedule. Contractor Heitkamp Erd- und Straßenbau was brought in to carry out the work as the firm had experience in runway rehabilitation projects having carried out pavemen