Skip to main content

Repaving an F1 racing circuit

The refurbishment of the Shanghai International Formula 1 was completed recently with great success. As an important milestone in the construction of racing facilities and modern high-grade roads in China, the project has attracted attention both inside and outside the industry.
By MJ Woof January 20, 2025 Read time: 2 mins
The use of Dynapac material feeders has helped deliver a more consistent paving quality

The Shanghai F1 circuit consists of the main track, buffer zone, short connecting track and working car lanes. The main track is 5,450m long and 14-15m-wide, with 16 corners and nine straights of varying lengths. This was the first refurbishment project since Shanghai F1 was first built in 2004.

Machines from Dynapac were used for all the paving and compaction works on the track. The 20 strong fleet included SD Pavers, CC4200/6200 double drum vibratory rollers, CC1200 small tandem rollers and also three mobile feeders.

The use of high-precision equipment and modern construction solutions have delivered optimum results for the track's base, middle and surface layers, which meet stringent international track's pavement standards after careful testing by a team of experts from Germany's HART CONSULTANT, the internationally renowned construction supervisory organisation for F1. 

At the beginning of the project, Annie Bo, managing director of Dynapac China, said: “We are very honoured to be able to participate in the Shanghai International Circuit project again. This is not only a recognition of Dynapac's products and technology, but also an affirmation of our 20 years of intensive work in the Chinese market. Dynapac will do its best to provide the best equipment and services to ensure the project is completed on time and with quality.”

Dynapac also set up an international service support team, which was stationed at the jobsite to support for the contractor, Shanghai Highway and Bridge (Group). The Dynapac team worked with Shanghai Road & Bridge to ensure that the equipment delivered maximum quality and performance for the operation.
The refurbishment of the Shanghai International F1 began at the end of July 2024 and was completed on 4th September, almost a week ahead of schedule. After the completion of the project, F1 will have a new look and upgraded performance for international races in the future. 

The application of Dynapac paving and compaction equipment has played a crucial role in improving the work efficiency of the whole project. The use of the latest techniques and the new equipment have played important roles,  delivering a quality circuit for Shanghai F1 in the global racing world. 

 

For more information on companies in this article

Related Content

  • Improved efficiency for material transfer
    March 24, 2020
    Dynapac’s latest material transfer vehicle (MTV) is said to offer improved efficiency and versatility for asphalt paving applications. In addition, the firm is also now introducing a versatile paver for the North American market.
  • New asphalt compaction technologies boost quality
    April 13, 2012
    More sophisticated compaction technologies are now coming to market, offering a wide range of benefits to users While asphalt paving techniques vary widely between North America and Europe, there is greater commonality in the compaction methods required. New developments in compaction rollers are offering contractors using both North American and European style paving techniques major gains in quality. According to Robert Horan, a regional engineer for the US-based Asphalt Institute, intelligent compact
  • New asphalt compaction technologies boost quality
    February 28, 2012
    More sophisticated compaction technologies are now coming to market, offering a wide range of benefits to users
  • Muscat Airport contract for Cooper
    February 9, 2012
    A huge project in Oman will see a proposed new terminal at Muscat International Airport, which has been budgeted at US$1.17 billion, completed by 2014. It will have the capacity to handle 12 million passengers annually, and further expansions planned by The Ministry of Transport and Communication in three subsequent phases will ultimately boost the airport’s capacity to 48 million passengers annually by 2050.