Skip to main content

Peruvian toll road 'environmentally sound'

The International Road Federation's Global Road Achievement Awards (GRAA) programme is a competition to honour and recognise road-industry projects that demonstrate excellence and innovation in road development worldwide.
February 23, 2012 Read time: 3 mins
RSS

The International Road Federation's Global Road Achievement Awards (GRAA) programme is a competition to honour and recognise road-industry projects that demonstrate excellence and innovation in road development worldwide.

The programme, which is designed to elicit information on successful projects and programmes from leading industry organisations, draws attention to these leading projects and organisations, providing a road map for others to follow in continuously improving and advancing road development worldwide.

The competition is open to all organisations involved in the road industry, and entries are judged by panels of expert judges drawn from 2462 IRF's academic members.

Peruvian toll road concession IIRSA Norte was honoured with a 2010 Global Road Achievement Award in the Programme Management section for its Integrating Engineering and Conservation Project at a ceremony keynoted by US 2410 Federal Highway Administration (FHWA) Administrator Victor Mendez in Washington DC in early 2011.

"This recognition fills us with immense pride, not only for the managers of the project IIRSA Norte, but to all Peru," said Ronny Loor Campoverde, General Manager, IIRSA Norte Concessionaire.

He added: "This award is so important to the transport industry because it is given by a relevant organisation on a worldwide basis and at the same time drives and encourages the development and maintenance of major road infrastructure in the world applying high quality standards."

Project summary IIRSA Norte Concessionaire builds, rehabilitates, improves, provides maintenance and operates through concessions on the 955km of road that unites the sea port of Paita to the river port of Yurimaguas. The road passes through the regions of Piura, Lambayeque, Cajamarca, Amazonas, San Martin and Loreto, and provides the possibility of river connection of northern Peru with brazil.

A joint venture of road infrastructure companies 1305 Odebrecht and 3126 Graña y Montero, the concession highway provided a significant boost to the development and modernisation of the communication routes in the country and as part of the South American regional road infrastructure integration promoted by regional governments and multi-lateral development organisations to, in turn, promote political, social and economic integration.

In fact, the Spanish acronym IIRSA stands for integration of South American regional infrastructure.

On 17 June, 2005, the work contract and maintenance concession of the multimodal axis of the North Amazon road sections of the 'Plan of Action for Integration South America - IIRSA' was subscribed.

The strategic function of this project was to improve logistical access to the Huallaga and Marañón Rivers and its ports; to consolidate the integration of Coast Mountain Forest of the north region of Peru and its regional complementarity with the state of Amazonia in brazil.

The work on sector 1 spanning 127km was completed in March, 2009. In engineering terms, it was one of the most complex sections of the concession, especially because sectors 2 and 4 (between kilometres 10 and 23, and between kilometres 33 and 37, respectively) presented quite unfavourable geological and topographical conditions.

Sector 1 presented strong external geodynamics, with rock falls and rockslides, planar landslides and erosion.

These sectors are located in a protected mountain range called Cordillera Escalera, which contain a representative sample of the tropical forests of the north zone of Peru, a region of extraordinary biodiversity.

The Cordillera was the first regional conservation area (RCA) established under Peruvian law by the National Institute of Natural Resources of Peru (INREN) in the San Martín region of Peru.

Consequently, this entire area is the focal point of significant environmental group concerns and activity.

This conservation project is expected to preserve a significant sample of cloudy forests in tropical mountains as well as ensure the high level of biological diversity well into the future.

The project also ensures the maintenance of existing environmental services such as the water supply for the local inhabitants and scenic beauty for both locals and tourists.

For more information on companies in this article

Related Content

  • Peruvian highway has highest tunnel
    October 2, 2014
    A new tunnel connection is helping boost connectivity in Peru, improving access to remote areas Building the tunnel has been an important project as Peru has an imbalance in population distribution with 54.6% of its inhabitants concentrated in the areas along the Pacific Ocean, while only 32% of the population lives in the Andes highlands and 13.4% in the Amazon tropical jungles. The imbalance is acute given that the tropical jungle areas account for 60% of the country’s national territory. Economic deve
  • IRF awards
    March 2, 2012
    The International Road Federation (IRF) has announced the winners of the 2011 Global Road Achievement Awards (GRAA) Competition.
  • Grana y Montero resume talks over potential Lima-Callao motorway in Peru
    February 19, 2013
    Peru holding company Grana y Montero has resumed talks with Lima district council over the possible construction of a 20.3km motorway between Lima and Callao, ending a 15 year delay in negotiations. The US$800 million project would involve French company Vinci. Grana y Montero and Vinci are also negotiating the implementation of two BRT lines in Lima.
  • Paruvian road concession package cancelled
    April 26, 2019
    The concession package for Peru’s Vía Expresa Sur road project is being cancelled. The deal was originally awarded to the Peruvian company, Grana y Montero (GyM). However the involvement of Brazilian firm Odebrecht in the project have resulted in the deal being cancelled. Odebrecht has been linked to string of corruption scandals. The tender process for the 5km road section will be reopened as a result. The project is intended to cut journey times in Lima, with the work expected to cost US$200 million.