Skip to main content

Nigeria has built a major road link from concrete

A new concrete road is now open to traffic in Nigeria’s Kogi State. This is of note as the new 24km road is the now the country’s longest to be made from concrete. The new road was built in a joint venture partnership between Nigerian firm Dangote Construction and Brazilian company Andrade Gutierrez. The new road connects Kabba with Obajana. Part of the Dangote Group, Dangote Construction was well placed to carry out the work as it operates its Obajana Cement production facility, at Obajana. This new road
September 14, 2016 Read time: 4 mins
The 200mm-thick slab features 12mm diameter tie bars
A new concrete road is now open to traffic in Nigeria’s Kogi State. This is of note as the new 24km road is the now the country’s longest to be made from concrete

The new road was built in a joint venture partnership between Nigerian firm 8506 Dangote Construction and Brazilian company 1339 Andrade Gutierrez.

The new road connects Kabba with Obajana. Part of the Dangote Group, Dangote Construction was well placed to carry out the work as it operates its Obajana Cement production facility, at Obajana.

This new road could well set a precedent for road construction in Nigeria. The country does have a high level of seasonal rainfall, which can result in rapid wear and tear for asphalt roads. Vehicles in Nigeria are also frequently overloaded, further increasing wear rates for asphalt types roads. But concrete roads may cope better with the seasonal rainfall and may also provide a greater resistance to vehicle overloading.

Drainage is a key issue for Nigerian road construction also, as the country’s seasonal tropical rainfall can result in large volumes of rainwater being deposited in a small area in a comparatively short period of time. The performance of this stretch of road in Kogi State is likely to be watched with great interest by the road authorities in various states across the country, as well as by the Federal Government in Abuja.
Dangote explained that it opted for this method of construction as using a slipform paver offers a productive method for road building, while also delivering a uniform structure. With a cement facility close at hand, the firm says it was able to monitor and maintain concrete quality to the necessary specifications and ensure a homogenous mix was supplied to the paver. Monitoring the paver’s operation also ensured that the necessary road profile could be achieved, according to Dangote.

The construction work for the 24km stretch of road took six months, with the road lying on a base comprising a compacted laterite filling and 150mm crushed stone. The road has been constructed on top of the base structure, using a 2395 Wirtgen SP 500 slipformer to pave the lanes in each direction of travel. This has required the construction of 3.65m wide by 200mm thick slabs in either direction, featuring 12mm diameter tie bars. Wirtgen’s local dealer was able to deliver training to the road construction crew from Dangote and Andrade Gutierrez, to make sure the personnel were able to make best use of the SP 500 meanwhile.
The project used around 35,000m3 of concrete, with four mixer trucks initially being used to carry the material from the plant to the slipformer and up to 15 in operation as the construction project reached its peak. After the slipforming work was carried out, expansion joints were then cut using conventional cutting equipment. Given the high temperatures Nigeria experiences, as well as the high rainfall levels in the rainy season, the expansion joints were specifically designed so as to allow sufficient expansion and contraction. These joints were also filled with a suitable material to cope with the wide temperature variations, as well as to provide efficient sealing and prevent water ingress.

According to Dangote, the firm expects the road to have a longer operating life than a comparable asphalt surface. Well-maintained concrete pavements can have a lifespan of 40 years and the country’s road authorities will be monitoring the performance of this section of road to see whether a concrete structure is suitable for Nigeria’s challenging climate. Should performance meet expectations, more concrete roads may well be built in Nigeria.

Concrete roads are comparatively rare in Africa as a whole, with the majority of surfaced roads in Africa being of asphalt construction. And the link along the coast from Ghanaian capital Accra to Tema to the east is one of the few other major routes in Africa that is made from concrete.

For more information on companies in this article

Related Content

  • World growth in geosynthtics set to rise
    February 17, 2012
    With geosynthetics sales set to grow rapidly in the next three years, manufacturers are preparing for the demand. Patrick Smith reports. Global demand for geosynthetics is projected to increase 5.3% annually to 4.7 billion m² in 2013 with countries such as China, India and Russia expected to post the strongest gains through the forecast period. All are building large-scale infrastructure developments and face evolving environmental protection regulations and strict building construction codes.
  • Bitumen technology suppliers seek new ways to save money and work more efficiently
    April 24, 2013
    When World Highways decided to ask some of the industry’s leading suppliers what the future holds for bitumen, we found out - not surprisingly in the current economic climate - that it’s all about saving money. Kristina Smith reports. How quickly the tide turns. Just two years ago, saving carbon and the planet was moving up many countries’ political agendas. Now politicians in Europe and beyond have been forced to park commitments in the face of economic austerity. “The big issue with local government is th
  • Kosovo's award-winning green highway construction
    March 20, 2012
    A new highway is proving an economic lifeline for the tiny country of Kosovo – Mike Woof reports. Road projects in Europe rarely meet such widespread public approval and support as the new Route 7 highway being built in the new Balkan state of Kosovo. The first sections of the new road opened to traffic in November 2011, with locals turning out in large numbers to celebrate the event. The official opening was carried out by the country’s prime minister Hashim Thaçi, president Atifete Jahjaga, and members of
  • Building the diamond road in Lesotho
    April 6, 2016
    A job site in the Southern African nation of Lesotho represents one of the most extreme and challenging projects to some key Italian firms of the last 10 years. The project was certainly different from the norm It involves building a road in the Lesotho Mountains, some 200km from the capital Maseru, with the work being carried out by the Cooperative of Building and Cement workers from Ravenna (CMC). CMC, which has ranked among Marini's clients for many years now, is involved in the construction of a